Published January 10, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Farmingdale, New York. Completed plans call for site work for a communication facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Estimated Range: $776,556.60 - $1,050,635.40 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work to include the removal of the existing asphalt for a large portion of the area around the building. Regrading areas, new site drainage system, extending the employee parking area and installing conduit for fiber-optic installation. The area will be repaved and line striped for parking. Pursuant to Public Building Law 8(6), any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYS-certified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,628,283 or less (maximum amount has been adjusted for inflation effective January 1, 2024). If more than one responsible and reliable MWBE firm meets the requirements, the MWBE firm with lowest bid will be deemed the apparent low bidder. In accordance with State Finance Law, Section 139-j, the following agency staff have been designated as contacts for this contract: For all technical questions - Utilize the contacts noted below: (Please email everyone) Mr. Scott Sepela 631-321-3536 Scott.Sepela@parks.n y.gov Mr. Shane Boone 631-321-3537 Shane.Boone@parks.ny .gov Mr. Adam Katz 631-321-3519 Adam.Katz@parks.ny.gov LIEngineeringContracts 631-321-3544 LIEngineeringContracts@parks.ny.gov For administrative related questions - Utilize the contact noted below: Ms. Margaret Ziminski/ Ms. Tiffany Willms 631-321-3544 LIEngineeringContracts@parks.ny.gov. The completion date for this project is 120 days* after agreement has been approved by the NYS Comptroller's Office. Substantial completion by April 30, 2025 Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 25% Women Owned Sub-Contracting Goal: 5% Service-Disabled Veteran-Owned Business Contracting Goal: 4% The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. All Requests For Information (RFIs) are due by: 10:00 AM on Wednesday, September 25, 2024 All Requests For Information (RFIs) are received. RFIs received after this due date and time will not be processed. Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a scanned Bid Security in the form of a certified check, bank check, or bid bond in the amount of: $ 36,544.00 (Thirty-Six Thousand Five Hundred Forty-Four Dollars and Zero Cents)

Award

Sidewalks / Parking Lot

$592,099.00

Public - State/Provincial

Paving, Site Work

11

15

9

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Starting and Adjusting, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Roof Tiles
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Wood Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
492
Active Projects
275
Bidding Soon
4,520
All Active Projects
2,069
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

November 4, 2024

img_map_placeholder

99 Quaker Meeting House Rd, Farmingdale, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Red Barn Site Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.