Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 11, 2025 at 7:00 PM
Updated November 12, 2025
Site work and paving for a civil project in Theodore, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.
Mobile County Contract Time: 75 Working Days for constructing the Micro-Milling, Micro-Fine Milling, Resurfacing, Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe on I-10 from the Mississippi State Line to the junction of the CR-39 (McDonald Road) Interchange to include the Eastbound Roadway Truck Weigh Station Improvements and Bridge Raising at Hall Road. Length 10.371 mi. The Bracket Estimate on this project is from $6,340,222 to $7,749,160. If further clarification is needed, please contact the Plans and Proposals Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 023 - Micro-Milling, Micro-Fine Milling, Resurfacing, Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe on I-10 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$7,651,084.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2025
January 6, 2026
I-10, Theodore, AL
Related To This Project
Theodore, AL
--
Theodore, AL
--
Theodore, AL
Bid Date: Dec 17 2024
Theodore, AL
Bid Date: Dec 04 2024
Theodore, AL
Bid Date: Jan 09 2025
Theodore, AL
--
Theodore, AL
Bid Date: May 21 2025
Theodore, AL
Bid Date: Sep 03 2024
Theodore, AL
Bid Date: Aug 30 2024
Theodore, AL
Bid Date: Aug 21 2024
Theodore, AL
Bid Date: Apr 23 2024
Theodore, AL
Bid Date: Apr 04 2024
Theodore, AL
Bid Date: Feb 27 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
