Demolition, site work, paving and new construction of a mixed-use development in Whitman, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for site work for a educational facility; and for paving for a educational facility.

As of November 4,2024, this project has not yet been awarded. A timeline for award has not yet been established. General Contractor and Filed Subcontractor Request for Qualifications for the Whitman Middle School project at 100 Corthell Ave,, Whitman, MA 02382. New construction of a 138,605 GSF middle school and associated sitework (utilities, parking, landscaping, etc.). Contractor Qualification DCAMM Certificate The Whitman Middle School project was voted by the MSBA to move forward with new construction. The project will be completed in 2 main phases, construction of the new building in phase 1 and demolition and site work in phase 2. The new Whitman Middle School will be located adjacent to the existing school in the current field. The new school will be 138,605GSF and will hold 675 students grades 5 through 8. Demolition of the old school and sitework will follow once students and faculty have moved into the new school. The Whitman Middle School consists of classrooms, offices, science labs, gymnasium, cafeteria, auditorium, media center, art and music rooms, and technology rooms. The new school consists of one 3-story building. The project also includes a new parking lot, landscaping, utilities, play fields and playground area. School will be in session throughout the duration of the construction project. The subcontractor is expected to be conscious of excessive noise and any disturbances to the school nearby, existing, and new Whitman Middle. The project is expected to have a construction duration of 32 months, approximately 18-22 months to build the new school and 8-12 months for demolition and sitework. Optional Site Visit There will be no optional site visit

Post-Bid

Educational

$105,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
213
Bidding Soon
2,499
All Active Projects
1,155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

February 14, 2025

img_map_placeholder

100 Corthell Ave, Whitman, MA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.