BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Moreno Valley, California. Completed plans call for the renovation of a power facility.

The total budget for the design and construction of the project is approximately between $3,000,000 and $4,000,000 which covers all costs for design, fabrication, delivery, installation, commissioning, and any and all items required for the completion of the project. The City of Moreno Valley (City) requests the submission of Request for Qualifications (RFQual) from qualified firms to provide Design and Construction Services . You are hereby invited to submit a completed Pre-Qualification Questionnaire and other material requested herein, as well as attachments for Public Works, Electric Utility. The City Of Moreno Valley, Moreno Valley Utility (MVU) seeks responses from qualified firms to design, fabrication, delivery, installation, and commissioning of an approximately 4 MegaWatt/8 MegaWatthour ("MW"/"MWH") battery energy storage system ("BESS"), along with related appurtenances, including, but not limited to, demolition of the existing capacitor banks and capacitor bank rack, and foundations, inverters, conduit, cable, installation of new pad foundations, batteries, install new relays, battery management/energy management systems that integrates with SCADA and transformersat the Moreno Valley Substation. This setup is designed to significantly enhance local energy resilience by enabling nearby facilities to operate independently during power outages, thereby reducing disruptions to essential community services and activities. RFQual shall be valid for a period of three hundred, sixty-five (365)calendar days after the Bid opening date. Question Deadline 10/01/2024 at 2:00 PM PT All questions, technical, commercial, or contractual in nature shall be directed to the Q&A section on the online The City reserves the right to waive informalities in any proposal, to reject any or all proposals, to reject one part of a proposal and accept the other, except to the extent that proposals are qualified by specific limitations, and to make awards to the Consultants whose proposal is most beneficial to the needs of the City. Construction Start: May 2025 Construction Complete: August 2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Power Plant

$4,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
478
Active Projects
216
Bidding Soon
3,565
All Active Projects
1,625
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 9, 2024

May 1, 2025

img_map_placeholder

To Be Determined, Moreno Valley, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.