EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 11, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a fire / police facility in Middletown, Connecticut. Completed plans call for the renovation of a 1,600-square-foot fire / police facility.

The City of Middletown is rehabilitating the second-floor quarters for the Middletown fire station located at 533 main street in Middletown of approximately 1,600 sf. Sleeping quarters, kitchen, day room and bathroom/shower rooms are to be improved. The fire department will use an alternate location during construction leaving full access to the building during construction efforts. The project will be bid in 3 separate phases depending on funding availability. A bid bond in the amount of five percent (5%) of the total bid amount shall be required with all bids submitted. Performance and Labor and Materials Payment Bond(s) in the amount of 100% of the contract sum shall be required from the selected bidder following award. A Maintenance Bond in the amount of ten percent (10%) of the contract sum shall be required after completion of work and prior to final payment. All bids shall be submitted in duplicate on the designated forms using the Bid Return Label provided as designated in the Information for Bidders by the date set and time. It is the responsibility of the awarded contractor to be knowledgeable and provide all requirements set forth under the SLFRF for all subcontractors and suppliers associated with this project. Bid proposals must be executed in accordance with and are subject to the instructions contained within the Information for Bidders. The three (3) apparent lowest responsible bidders' bid bond documents may be held for a period of up to ninety (90) consecutive calendar days or until a contract is signed and then all bond documents, other than those of the successful responsible bidder shall be returned. The City of Middletown reserves the right to waive any defect or any irregularity in any bid and reserves the right to reject any or all bids or any part thereof. Bids and amendments to bids received after the time set for the bid opening will not be considered. All bids must be completely filled out when submitted. No bid may be withdrawn for a period of ninety (90) days subsequent to the opening of bids without the written consent of the City of Middletown. Withdrawal of any bid must be submitted in writing to the City of Middletown. All bids and proposals are subject to, and must comply with the equal opportunity and non-discriminatory provisions set forth in the Affirmative Action Plan of the City of Middletown. Question Deadline 09/24/2024 at 12:00 PM ET

Bid Results

Fire / Police

$214,800.00

Public - City

Renovation

13

18

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Maintenance Data, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Shingles and Shakes, Wood Shingles
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Wood Doors, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting, Emergency Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
559
Active Projects
350
Bidding Soon
4,770
All Active Projects
2,222
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

November 7, 2024

img_map_placeholder

533 Main St, Middletown, CT


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Fire Headquarter Renovations - Fire Department

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.