BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Lakewood, Colorado. Conceptual plans call for the renovation of a military facility.

The General Services Administration (GSA), Public Buildings Service (PBS), Region 8, Office of Acquisition Management Capital Program is conducting market research and is seeking competent and qualified construction firms to provide Design-Bid-Build (DBB) services for the replacement of storefront and windows at Building 25 of the Denver Federal Center (DFC) in Lakewood, Colorado. This project will replace window units with a minimum of a 3-pane system and incorporate Low Embodied Carbon (LEC) fixed glazing. GSA is seeking highly qualified firms with experience in the following: Curtain wall and/or window replacement. The magnitude of construction is estimated to be between $5,000,000 and $10,000,000. Description of Work: Building 25 is one of the highest rated spaces on the DFC, equivalent in some respects to class A space in the private sector. This two-story brick office and laboratory facility has multiple space categories, with office space being the majority of 207,024 GSF. There is also laboratory space of 36,723 GSF, an auditorium, a health unit and light industrial space. Constructed in 1941, it was initially a part of the munition facility, and then converted into an office building and laboratory space after the war. A major renovation of the building was completed in July 2004, and the building systems were modernized, and floorplans were rethought and changed. It continues to serve as primary office space and laboratory space on the northeast side of the Denver Federal Center and represents one of the DFC's best classes of space available. The primary aspect of this project for Building 25 is to replace approximately 4000-6000 square feet of window units with a minimum of a 3-pane system and incorporate Low Embodied Carbon (LEC) fixed glazing. The replacement of the windows will involve the removal of the entire existing units, limited demolition of the existing building envelope, installation of new structural framing in various locations and finally installing the new curtain wall framing / glazing system. Individual window replacement has been on-going but many single pane windows remain. Many of the windows have been replaced with storefront systems and double low-E glazing. There are random pockets of single pane windows throughout the building and at times are adjacent to double-pane windows. The window types vary in size and configuration, such as punched openings, storefront, and window/spandrel combination units. This project is funded by the Inflation Reduction Act (IRA). Low-embodied carbon material requirements are governed by the funding law and can be found here: https://www.gsa.gov/real-estate/gsa-properties/inflation-reduction-act/lec-program-details/material-requirements The contractor will be responsible for meeting these material requirements as well as providing the required documentation and budget management for reporting requirements. Please see attached sources sought document for further details The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Military

$10,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
110
Bidding Soon
1,678
All Active Projects
714
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 3, 2025

img_map_placeholder

Kipling St & W 6th Ave, Lakewood, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.