BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Rainsville, Alabama. Completed plans call for site work for a water / sewer project.

The work of providing labor, equipment, and material for the West Lauderdale Water System Improvements Contract No. 1 - County Road 90 Water Line Extension The principal items of work are detailed herein below: 1. 13,700 LF of 6" Class 200 PYC Pipe 2. 1,500 LF 6" HDPE Pipe, DR9 (Furnish and Install, By Directional Bore Method 3. Gate Valves (Furnish and Install) 4. Two (2) Wet Connections (Furnish and Install) 5. Fire Hydrants (Furnish and Install) 6. New Service Connections 7. Service Recommendations The Contract may be awarded to the lowest and responsive Bidder. The successful bidder must furnish a Performance Bond for one hundred (100%) of the bid amount and a Payment Bond for one hundred (100%) percent of the bid amount and must secure his bond from a bonding company's representative or agent in the State of Alabama. The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 180 consecutive calendar days total and noted restrictions shall be strictly observed The Owner reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner. The work of providing labor, equipment, and material for the West Lauderdale Water System Improvements There will be no Pre-Bid meeting Question Deadline 10/07/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other

Bid Results

Water / Sewer

$1,033,348.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
38
Bidding Soon
725
All Active Projects
263
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

November 18, 2024

img_map_placeholder

Co Rd 90, Rainsville, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.