BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chinle, Arizona. Completed plans call for the renovation of a educational facility.

1. Funding: A single firm fixed-price contract will be made under this solicitation, as funds are presently available. The Government reserves the right to cancel this solicitation / Request for Proposal (RFP) before the closing date. 2. Proposal Acceptance Period/Date: The proposal acceptance period shall extend one hundred twenty (120) days past the RFP closing date. 3. RFP Deadline: September 19, , at 2:00pm MDT. The Contracting Officer expects prospective contractors to provide their proposal via e-mail to Krisanne.Dernago@bie.edu 4. Questions and Answers: Any questions relating to this solicitation shall be submitted to the following individuals: Contract Specialist (CS), Contracting Officer (CO) and Contracting Officer's Representative (COR) no later than September 18, , at 1:00pm MDT. Any questions sent shall be submitted on the Questions and Answers Log attached to this RFP. 5. On-site Access: A list of personnel, with all pertinent information, to include, name, phone number, e-mail, and contractor name, shall be submitted to the CS, CO, and COR. A Site Visit for this requirement is scheduled to occur on September 16, , at 9:00am MDT at the Cottonwood Day School, Chinle, AZ. Please email the CS of your intent to participate in the site visit meeting NLT one day prior to the site visit. 6. Wage Determination: Wages for all contractors and subcontractors must comply with Davis Bacon Wage Determinations. The current determination is #AZ0022 dated 01-12-; See attachment- Wage Determination. Be advised the determination that is current at the time of the Purchase Order awarded is the determination that will apply for the project. Current determinations are always available at: https://sam.gov/. 7.Notice to Proceed (NTP): A NTP will be issued after the kickoff/Pre-Construction meeting, Receipt of Bonding and Valid Background Screening. 8.Period of Performance: Sixty (60) Calendar Days from the notice to proceed (NTP) 9.In accordance with FAR Part 63.204 -Disclosure of the Magnitude of Construction Projects, the estimated price range is between $100,000.00 - $250,000.00. 10.Special attention is called to FAR Clause 52.236-7, Permits and Responsibilities and FAR Clause 52.229-3, Federal, State, and Local Taxes. Offerors are responsible for contacting the tax authorities and tribe or tribal organization involved with regard to any requirements regarding state taxes, tribal taxes, royalties and/or other applicable tribal laws or ordinances. Any costs associated with this section shall be included in the contractor's firm fixed price proposal. Contractor is responsible for contacting the appropriate TERO and/or appropriate Tribal Taxation Authority office for coordination and approvals. Please refer to Section H and the applicable clauses for additional information about these requirements. The contractor shall furnish materials needed to complete the Roof Replacement requirement for the Cottonwood Day School. Contractor shall not work on holidays and will only work on business hours, Monday thru Friday between 9:00 am and 4:00 pm. Due to inclement weather project can be proponed. The Government is requesting two separate prices, one for the removal of existing roof and one for laying over existing roof. o Option One: Demo/remove existing, single-ply wall flashing, curb flashing and pipe flashing and dispose of accordingly, cut existing roof system in 10' sections. oOption Two: Clear roof top of debris, cut or slice into existing TPO membrane to provide proper air flow per manufacturers specification/recommendation. Cut down old TPO flashing from walls, pipes, curbs as necessary, repair/replace existing gutter and metal drip edge if necessary, install new TPO roof system and fasten per manufacturers specifications. oProvide and install 1-layer of hp protective mat secure with plates and screws over existing roof. oProvide and install Mule hide 60 mil TPO single-ply roofing system mechanically attached with plates and screws. oProvide and install new equipment curb flashings, stack flashing, and scuppers as needed. oBase flashing to go up and over walls under existing coping cap (reuse). oClean up and remove all roofing debris caused by new roof construction. oProvide contractors 1-year warranty and manufactures 20-year NOL. Warranty with wind uplift. All work shall be coordinated with the COR and must be completed within the period of performance during regular working hours, Monday - Friday, 8:00 a.m. to 4:00p.m., as scheduled. 11. A contract is being competed using the Lowest Price Technically Acceptable source selection process described in Section L & M. In accordance with section M, the total price will be evaluated upon reasonableness and completeness. Note, only the lowest price responsive offer will be evaluated for technical acceptability. If the lowest price responsive offer is technically acceptable; award will be made to that offeror and no other offeror will be reviewed for technical acceptability. 12. Points of Contact: CS/CO/COR: CS: Krisanne Dernago, Krisanne.Dernago@bie.edu CO: Dawn Sekayumptewa, dawn.sekayumptewa@bie.edu COR: Marco Faber, Marco.Faber@bie.edu SITE VISIT POC: Marco Faber and Terance Lee, Terence.Lee@bie.edu The government intends to award a single Firm Fixed Price Construction Contract because of this solicitation. Contractor shall furnish all labor, materials, tools, equipment, and supervision for the replacement of TPO Roof located at Cottonwood Day School, Chinle AZ. This is 100% set-aside for ISBEE Indian Small Bus. Economic Enterprises. NAICS: 238990 Small Business size $19.0M Delivery Location BIE Cottonwood Day School Navajo Route 4 Chinle, AZ 86505 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$250,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
1
Bidding Soon
30
All Active Projects
13
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

October 21, 2024

img_map_placeholder

Navajo Rt 4,, Chinle, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.