BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2024 at 7:00 PM

Updated March 26, 2025

Site work and paving for a mixed-use development in Fresno, California. Completed plans call for site work for a playground / park / athletic field.

**As of November 22, 2024, This project has been awarded to GCB1 Inc., with the awarded amount of $578,657.31.** The scope of work includes but is not limited to; improvements at Cary Park and Vinland Park. Cary Park scope of work involves installation of new park bench(es), waste receptacle(s), Measure P signage, ADA compliant deepened concrete playground curb and concrete edge, removal of existing playground equipment, removal and replacement of existing wood mulch surfacing with poured-in-place rubber surface subgrade and accessibility improvements. Vinland Park scope of work involves installation of new park bench(es), waste receptacle(s), Measure P signage, shade sail structure, shade trellis, ADA compliant deepened concrete playground curb, and accessibility improvements. Online Q&A No Start/Delivery Date Date of notice to Proceed Project Duration 120 Working days from Notice to Proceed Date Liquidated Damages $500 per day for each calendar day. License Requirements Valid Class "A" or Class "B" Contractor's License issued by the State of California Project Type Bid Response Types Line Items Required Bid Documents (required) General Attachment Type of Award Lump Sum Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 10/08/2024 The Construction Allocation for this project is $550,498.

Award

Roads / Highways

$578,657.00

Public - City

Paving, Site Work

26

14

6

8

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
52
Bidding Soon
630
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 14, 2024

Project location map

Multiple Locations, Fresno, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.