BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Fresno, California. Completed plans call for site work for a playground / park / athletic field.

**As of November 22, 2024, This project has been awarded to GCB1 Inc., with the awarded amount of $578,657.31.** The scope of work includes but is not limited to; improvements at Cary Park and Vinland Park. Cary Park scope of work involves installation of new park bench(es), waste receptacle(s), Measure P signage, ADA compliant deepened concrete playground curb and concrete edge, removal of existing playground equipment, removal and replacement of existing wood mulch surfacing with poured-in-place rubber surface subgrade and accessibility improvements. Vinland Park scope of work involves installation of new park bench(es), waste receptacle(s), Measure P signage, shade sail structure, shade trellis, ADA compliant deepened concrete playground curb, and accessibility improvements. Online Q&A No Start/Delivery Date Date of notice to Proceed Project Duration 120 Working days from Notice to Proceed Date Liquidated Damages $500 per day for each calendar day. License Requirements Valid Class "A" or Class "B" Contractor's License issued by the State of California Project Type Bid Response Types Line Items Required Bid Documents (required) General Attachment Type of Award Lump Sum Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 10/08/2024 The Construction Allocation for this project is $550,498.

Award

Roads / Highways

$578,657.00

Public - City

Paving, Site Work

26

14

6

8

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
27
Bidding Soon
401
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 14, 2024

img_map_placeholder

Multiple Locations, Fresno, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.