BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2024 at 8:00 PM

Updated October 31, 2024

Site work and paving for a mixed-use development in Old Bridge, New Jersey. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Route 9, Throckmorton Lane/Ticetown Road to Poor Farm Road/Hartle Lane, Contract No. 124203330, Curb Ramps, Signals, Guide Rail, & Drainage, Township of Old Bridge, Middlesex County; Federal Project No: 0009341, UPC No: 203330, PE No: 1206516, CE No: 1206518, Estimated Range between $2,500,001 to $5,000,000 Contractors Prequalified in one of these Work Types are eligible to bid this project: 7, or 5 The Principal Items of Work Consist of: Roadway Quantity Unit Description 1,359 Sy Concrete Sidewalk, 4" Thick 2,619 Lf 9" X Various Concrete Vertical Curb 6,357 Lf Modified Thrie Beam Guide Rail, Dual Faced 6,316 Lf Rub Rail 2,043 Lf 3" Rigid Metallic Conduit Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning The Contract to Section 108-prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33. NJDOT: 130 - Curb Ramps, Signals, Guide Rail & Drainage - Route 9 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Completion Date on 12/07/2026 MBE (5.8%), WBE (6.9%), DBE (7%)

Award

Sidewalks / Parking Lot

$3,895,814.00

Public - State/Provincial

Paving, Site Work

887

3

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
943
Active Projects
425
Bidding Soon
7,492
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

December 2, 2024

Project location map

US-9, Old Bridge, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.