Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Suffern, New York. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
This is an RFQ. (request for quotes). This is not an IFB (bid). The Hudson Valley DDSO intends to award the contract to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. Upon request, vendor must demonstrate 2 years of relevant experience on prior projects of similar magnitude and its subject to vendor responsibility determination. Hudson Valley DDSO reserves the right to reject any and all quotes. In deciding whether to submit a quote, please be aware the awarded vendor must adhere to the time frames outlined in the scope of work. The awarded vendor will also be required to submit certificates of Liability Insurance and Worker's Compensation Insurance as well as completed Lobbying Law Forms, and signed Appendix A. Please be prepared to submit these in a timely fashion. The Hudson Valley DDSO will make no concessions to the vendor for any alleged misunderstanding or deception because of quantity, quality, character, or other condition. The Hudson Valley DDSO's interpretation of specifications shall be final and binding. Please note, all staff working at the project site will be required to sign an attendance sheet for record purposes. This includes the residence visitor log and/or an attendance sheet provided by the Maintenance Department. In the event of a tie, contract will be awarded to the Contractor whose bid was received earliest Driveway Resurfacing. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of Driveway Resurfacing, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following: 1. 2. 3. 4. 5. 6. 7. 8. 9. The vendor is paving approximately 4,600 sq. feet. The vendor is responsible to verify all measurements. The vendor will grind down top layer of existing driveway and parking area. The vendor will be required to excavate, and grade/ slope the entire area of the driveway for proper drainage as needed. Add and compact sub-base as needed. The vendor will supply and apply a layer of tack coat on grinded driveway. The vendor will pave a layer of HMA finish/ surface coarse at minimum thickness of two (2) inches. The vendor is responsible for smooth transition/ grading of butt joints to roadway, walkway, and connecting driveway. HVDDSO will provide the item# 4 stone and asphalt for this project. The vendor shall provide all required trucking of materials (i.e. Item#4, asphalt) delivered to site, install all materials as required for this project and follow manufacturer's instruction for placement of materials and industry standards. 10. The Vendor shall submit all pick up/delivery tickets to HVDDSO Work Control representative. 11. The vendor will supply all pick up/ delivery tickets included with invoice at the completion of project. Failure to do so will delay in payment. 1. GENERAL REQUIREMENTS: 1. 2. 3. 4. 5. 6. 7. 8. 9. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. Work is to be done between the hours of 8:00 am and 4:00pm, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each work day. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD. Prior to the commencement of the work, there shall be a meeting with HVDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. The NYS OPWDD HVDDSO Region 4 Office reserves the right to pre-approve all Sub contractors. Any Contractor intending to use sub-contractors must provide the NYS OPWDD HVDDSO Region 4 Business Office with all sub-contractor's contact information, in writing, prior to the determination of approval. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work
Post-Bid
Sidewalks / Parking Lot
$50,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2024
November 4, 2024
15 Camp Hill Rd, Suffern, NY
Related To This Project
Suffern, NY
--
Suffern, NY
Bid Date: Oct 17 2024
Suffern, NY
--
Suffern, NY
Bid Date: Nov 15 2024
Suffern, NY
Bid Date: Sep 25 2024
Suffern, NY
Bid Date: Sep 12 2024
Suffern, NY
Bid Date: Sep 12 2024
Suffern, NY
Bid Date: Sep 03 2024
Suffern, NY
--
Suffern, NY
Bid Date: Aug 07 2024
Suffern, NY
Bid Date: Jun 28 2024
Suffern, NY
Bid Date: Jun 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.