Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a sidewalk / parking lot in Suffern, New York. Conceptual plans call for the renovation of a sidewalk / parking lot.
Egress Stair/ Ramp Design. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of Egress Stair/ Ramp Design, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. This is an RFQ (request for quotes). This is not an IFB (bid). The Hudson Valley DDSO intends to award the contract to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. Upon request, vendor must demonstrate 2 years of relevant experience on prior projects of similar magnitude and its subject to vendor responsibility determination. Hudson Valley DDSO reserves the right to reject any and all quotes. In deciding whether to submit a quote, please be aware the awarded vendor must adhere to the time frames outlined in the scope of work. The awarded vendor will also be required to submit certificates of Liability Insurance and Worker's Compensation Insurance as well as completed Lobbying Law Forms, and signed Appendix A. Please be prepared to submit these in a timely fashion. The Hudson Valley DDSO will make no concessions to the vendor for any alleged misunderstanding or deception because of quantity, quality, character, or other condition. The Hudson Valley DDSO's interpretation of specifications shall be final and binding. Please note, all staff working at the project site will be required to sign an attendance sheet for record purposes. This includes the residence visitor log and/or an attendance sheet provided by the Maintenance Department. In the event of a tie, contract will be awarded to the Contractor whose bid was received earliest. Prevailing Wages: Schedule PRC #: NYS Labor law requires that all contracted employees performing maintenance, repairs or capital improvements in state owned buildings receive the prevailing wage and supplements rate for the occupation in which they are working. If this is a public work contract covered by Article 8 of the Labor Law or a building service contract covered by Article 9 thereof, neither Contractor's employees nor the employees of its subcontractors may be required or permitted to work more than the number of hours or days stated in said statutes, except as otherwise provided in the Labor Law and as set forth in prevailing wage and supplement schedules issued by the State Labor Department. Furthermore, contractor must pay at least the prevailing wage rate or provide the prevailing supplements, including the premium rates for overtime pay, as determined by the State Labor Department in accordance with the Labor Law. NYS law requires the vendor to keep detailed records for each person employed including name, address, telephone number, social security number, occupational classification in which worked, hourly wage rate paid, supplements provided, number of hours worked, and actual wages paid. Certified payroll record/s MUST be submitted at the time of invoicing. Effective April 28, 2008, if this is a public work contract covered by Article 8 of the Labor Law, the contractor understands and agrees that the filing of payrolls in a manner consistent with Subdivision 3-a of Section 220 of the Labor Law shall be a condition precedent to payment by the State of any State approved sums due and owing for work done upon the project. Without submittal of certified payroll record/s, payment will not be made. Service-Disabled Veteran-Owned Set Aside: No Contract term: Within 30 days of receiving the purchase order SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Vendor will design new egress stairs to replace existing stairs from second (2) floor that leads down to the parking/ driveway area. 2. Vendor will design new ramp to replace existing ramp from the front door leading to driveway. 3. Designs will incorporate as many ADA guidelines as possible in the allotted space/construction area. 4. Specifications OPWDD required for designs: a. Brackets/ Post Bases/ Fasteners: Stainless steel materials will be used unless it not available by manufacture. An equivalent will be used in its place. b. Rough Lumber- High quality #2 grade or better will be used. c. Decking- Composite material boards will be used like Trex or equivalent. d. Railing- ADA standard railing will be used. (PVC coated over Aluminum) 5. Design will shall comply to the current NYS Code and manufacture guideline. 6. The design must be approved by OPWDD's Architect. 7. Any code violations per design will be the designer's financial responsibility for changes. The method of Contractor Selection has not been Determined at this time.
Conceptual
Sidewalks / Parking Lot
$50,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
638 NY-306, Suffern, NY
Related To This Project
Suffern, NY
Bid Date: Nov 15 2024
Suffern, NY
Bid Date: Oct 17 2024
Suffern, NY
--
Suffern, NY
Bid Date: Oct 03 2024
Suffern, NY
Bid Date: Sep 25 2024
Suffern, NY
Bid Date: Sep 12 2024
Suffern, NY
Bid Date: Sep 12 2024
Suffern, NY
Bid Date: Sep 03 2024
Suffern, NY
--
Suffern, NY
Bid Date: Aug 07 2024
Suffern, NY
Bid Date: Jun 28 2024
Suffern, NY
Bid Date: Jun 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.