BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Garden Grove, California. Completed plans call for site work for a water / sewer project.

The project consists of constructing approximately 10,000 linear feet of new 8-inch PVC pipe to replace undersized 6-inch water mains at Chapman Avenue, Nearing Drive, Augusta Drive, Moen Street, Fortney Drive, Buchanan Drive, Poe's Street, Somers Drive, Fillmore Drive, Arthur Drive, Sandy Drive and Rock view Drive in the unincorporated area of Orange County and City of Stanton. This replacement project will also address fire flow deficiencies. The construction includes the installation of new fire hydrants and water service laterals, fittings and appurtenances. Work also includes trenching, shoring, backfilling, compaction, asphalt repair and replacement, and pipe disinfection and testing. This project will require (but not limited to) protecting existing utilities, coordination with utility owners and customers, traffic control plans, permits and implementation, construction surveying, cutting and capping of existing water mains and service laterals to be abandoned, temporary offsets of the existing water main crossing new water main, vertical off-sets, water shutdown coordination and notification, water system tie-in/connection locations, demolition and disposal of asbestos cement pipe, traffic striping, traffic loop detector replacement, and appurtenant work. The project will be constructed in two phases. Working hours at Nearing Drive and Chapman Avenue may be restricted do to school traffic coordinating with Saint Polycarp School and Church and Bryant Elementary School may be necessary. This project should be complete within one hundred and twenty (120) total working days from the notice to proceed. The first day of construction shall be December 2, 2024. Engineer's estimate on this project is around $6,253,875 dollars. Direct ANY and ALL questions to Ms. Jessica Polidori, Project Manager, (714) 741-5346.

Award

Water / Sewer

$4,129,980.00

Public - City

Site Work

32

8

4

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
114
Bidding Soon
2,398
All Active Projects
943
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

December 2, 2024

img_map_placeholder

Multiple Locations, Garden Grove, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.