BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in International Falls, Minnesota. Completed plans call for the renovation of a military facility.

Replace Power Distribution Line This project will replace the main underwater high voltage cable and multiple transformer boxes that run from the mainland to the Kettle Falls district. Pad-mounted switchgear, sectionalizing enclosures, elbow terminations, as well as individual and other associated components will be replaced as needed. An improved level of emergency backup generation for critical loads at Kettle Falls Area will be installed. Due to the compromised neutral wire, this poses a serious safety risk to visitors as well as employees. The neutral serves as a ground for the cable, and as more lightning strikes occur the chances of someone being struck increase. Secondly when power goes out facilities are forced to be closed such as restrooms, showers, and the restaurant. There is also a food safety factor at the restaurant due to the freezers and coolers loss of power. This has potential for food to develop bacteria that could lead to sickness of visitors. The Fire suppression system pumps are run by electricity; therefore, if there is no power then there is no fire protection for the Historic hotel. This jeopardizes the visitor's safety as well as the historic building. The new backup generator would allow the concession to continue to stay operational in the event of a power outage Estimated Magnitude of Construction: Greater than $10M The Contractor shall begin performance within 10 calendar days and complete it within 714 calendar days

Post-Bid

Military

$12,121,765.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
23
All Active Projects
8
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2024

December 3, 2024

img_map_placeholder

To Be Determined, International Falls, MN

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.