BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2024 at 8:00 PM

Updated October 29, 2024

Renovation of an educational facility in Durant, Oklahoma. Completed plans call for the renovation of a educational facility.

Bids Received: AI Roofing- $300,250 Coontz Roofing Inc-$604,000 Commercial Roofing- $491,333 Oklahoma Roofing- $711,775 L. Wallace Construction Co John Riggs- $772,959 Kennedy Roofing Nathaniel Grayson-$312,194.43 Crawford Roofing Inc-$392,175 All Seasons Contracting- 382,250 Multiple Roofs Project Project Specifications: Bloomer Gymnasium High & Low Roof *Remove existing membrane roofing system *Remove tar and gravel roof system down to decking *Fully adhere 2 in insulation board over roof deck *Fully adhere 60 mil TPO over roof area *Replace wood nailers around perimeter *Install 22-gauge metal cleat around perimeter *Install 24-gauge metal edge flashing around perimeter *Properly flash all roof penetrations Bloomer Sullivan Arena Low Roof * Remove existing membrane roof system *Remove tar and gravel roof system down to metal decking * Mechanically attach 1.5" insulation over roof area *Install tapered insula0 on for proper drainage * Fully adhere 60 mil TPO over roof area * Install new wood nailer around perimeter *Install new 22-gauge clip *Install new 24-gauge metal edge flashing * Install termination bar on brick wall *Install wall mounted counter flashing Hallie McKinney Low Roof *Remove existing membrane roofing system *Remove tar and gravel roof system down to decking *Fully adhere 2 in insulation board over roof deck *Fully adhere 60 mil TPO over roof area *Replace wood nailers around perimeter *Install 22-gauge metal cleat around perimeter *Install 24-gauge metal edge flashing around perimeter *Properly flash all roof penetrations Morrison West Low Roof *Remove existing wood structure and frame from roof area *Remove existing Duralast roof system from roof area *Remove tar and gravel roof system down to decking *Clean and prime concrete decking *Fully adhere 2" insulation over roof area *Fully adhere 60 mil TPO over insulation *Install new wood nailers around perimeter *Install new 22-gauge metal clip *Install new 24-gauge metal edge flashing

Bid Results

Educational

$300,250.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
85
Bidding Soon
2,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

November 11, 2024

Project location map

425 University Blvd, Durant, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.