Demolition and site work for a civil project in Signal Hill, California. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

Gundry Reservoir Roof Replacement and Rehabilitation Project. The engineer's estimate is $2,859,000 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $5000. Start/Delivery Date Gundry Reservoir may be scheduled for shutdown on or about October 1st, 2025. Material items must be procured in advance of shutdown. Project Duration 120 Working days Question Deadline 10/04/2024 at 12:00 PM PT Online Q&A Yes License Requirements Prime Contractor shall possess General Engineering A license Scope of Services The Work under these Contract Documents includes, providing all labor, products, materials, tools, equipment, and incidental services for the Gundry Reservoir Rehabilitation Project including (but not limited to) : 1. Demolition, dismantling, removal, and disposal of the existing Gundry reservoir and sand basin roofing system, supporting columns and footings, concrete coatings, piping and pipe support/hangers coatings and hardware, overflow grating, transducer and wiring as needed, sample piping as needed and landscaping to accommodate drainage improvements, including a small detention basin. Salvage materials as described in the Contract Documents. Salvage includes pipe supports 2. Site earthwork consisting of minor grading to accommodate a drainage swale and retention basin. 3. Removal of existing coatings and linings, crack repair and relining for the Gundry Reservoir: One 5 MG semi below grade, circular existing concrete tank for potable water storage and associated appurtenances. 4. Tank piping including: Proposed Inlet piping (12-inch); rehab existing outlet piping (4-outlets of unknown size); an inlet piping sample line. 5. Aluminum Roofing Installation on the existing concrete reservoir walls and existing sand basin concrete walls. 6. Coordination with City of Signal Hill and the MWD operations for scheduling valve closures to isolate pipelines and Reservoir shutdowns and other coordination as necessary to accomplish the work of the project. Include provisions to handle water when dewatering isolated pipelines. 7. Ancillary work including mobilization, bonds, permits, and demobilization; temporary erosion control including a Storm Water Pollution Prevention Plan (SWPPP); traffic control and permitting.

Bid Results

Water / Sewer

$5,599,896.00

Public - City

Demolition, Site Work

26

20

44

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
133
Bidding Soon
2,365
All Active Projects
1,078
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

October 1, 2025

img_map_placeholder

3315 Gundry Ave, Signal Hill, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.