Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 6, 2025 at 8:00 PM
Updated June 7, 2025
Site work and paving for a road / highway in Signal Hill, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of June 06, 2025 this project has not yet been awarded. A timeline for award has not yet been established. Scope of Services The City of Signal Hill is seeking capable, qualified, and competent contractors to perform pavement markings and striping in Segment B of the City. The scope of work consists of furnishing all labor, materials, equipment, tools and incidentals as required to complete the work. The work to be accomplished under this contract generally includes, but is not limited to the following: o Clean, prepare, and stripe a combination of residential, collector, and arterial streets. o Clean, prepare and paint a variety of pavement marking types. The prospective contractor will need to verify and track quantities and adhere to the proper spacing and type of marking in the right-of-way (ROW). All Work must be completed within thirty (30) working days after receipt by the Contractor of the Notice to Proceed from the City of Signal Hill. Traffic striping shall consist of any and all work required to install replacement pavement striping, paint, thermoplastic, markings, and legends to their original locations. Pavement marking, legends, crosswalk, limit lines, and striping shall conform to the latest provisions of Section 84, "Traffic Stripes and Pavement Markings", of the Caltrans Standard Specifications and these special provisions. These have been included under the "Attachments" Tab for reference. Contractor is responsible for providing all submittals prior to the start of work. Contractor will be responsible for correcting drips, deforming, shadowing, etc. City Staff will field verify all painted/thermoplastic areas performed by the contractor and issue corrections as required. All striping and pavement markings work shall be in accordance with the latest edition of the State of California Department of Transportation Standard Plans. Work performed shall adhere to the latest edition of the California Watchbook for Temporary Work Zones and 2014 MUTCD latest revision for specialty work zones as required. The contractor shall furnish the necessary control points for all striping and markings and shall be responsible for the completeness and accuracy thereof to the satisfaction of the Engineer. No striping shall be installed until the layout and spotting has been specifically approved by the City. Payment for furnishing all labor, materials, tools, equipment, and incidentals necessary to complete the quantities noted in the line items section and all related work including layout, spotting, painting two coats, and protecting completed work are considered as included in the Contract price PER UNIT (i.e. LF or EA.). Although the project is considered maintenance work the project will require DIR registration and certified payroll submittals. Bid Valid 45 Days Liquidated Damages $500 Estimated Bid Value $30,000 Start/Delivery Date May 2025 Project Duration 10 working days Question Deadline 04/25/2025 at 2:00 PM PT For further information, contact the Public Works Contracts Manager, Margarita Beltran, at mbeltran@cityofsignalhill.org.
Bid Results
Roads / Highways
$68,552.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2025
May 30, 2025
Multiple Locations, Signal Hill, CA
Related To This Project
Signal Hill, CA
Bid Date: Apr 18 2025
Signal Hill, CA
Bid Date: May 09 2025
Signal Hill, CA
Bid Date: May 27 2025
Signal Hill, CA
Bid Date: Aug 01 2025
Signal Hill, CA
Bid Date: Nov 13 2025
Signal Hill, CA
Bid Date: Mar 24 2025
Signal Hill, CA
Bid Date: Feb 28 2025
Signal Hill, CA
Bid Date: Feb 26 2025
Signal Hill, CA
--
Signal Hill, CA
Bid Date: Oct 28 2024
Signal Hill, CA
Bid Date: Apr 14 2025
Signal Hill, CA
Bid Date: Sep 17 2021
Signal Hill, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
