Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Site work for a water / sewer project in Red Bluff, California. Completed plans call for site work for a water / sewer project.

The city is proposing to replace the existing sewer collection system junction structure that carries approximately 95% of the Citys influent flow to the wastewater treatment plant located adjacent to I-5. GENERAL WORK DESCRIPTION: The city is proposing to replace the existing sewer collection system junction structure that carries approximately 95% of the City’s influent flow to the wastewater treatment plant located adjacent to 1-5. All work is to be in conformance with the attached Plans and Specifications titled WALTON DRIVE SANITARY SEWER JUNCTION STRUCTURE REPLACEMENT IMPROVEMENTS.

Award

Water / Sewer

$586,375.00

Public - City

Site Work

9

11

2

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
33
Bidding Soon
341
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 4, 2025

Project location map

Walton Dr, Red Bluff, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed