EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Wappingers Falls, New York. Completed plans call for the renovation of a educational facility.

As of November 12, 2024, this project has not yet been awarded. The project is expected to be awarded on November 18, 2024. The Work is scheduled to start upon award of contract and is subject to the Milestone Schedule contained in the Project Manual - Specification Section 011200 - Multiple Contract Summary. GW.2 Budget: $1,600,000 The work will be bid in five Contracts. General Work - Contract GW.2 HVAC Work - Contract HVAC.2 Plumbing Work - Contract P.2 Electrical Work - Contract E.2 Hazardous Materials Abatement - Contract HM.2 Document Notes : Complete sets of Bidding Documents, Drawings and Specifications, may be obtained from REVplans, 28 Church Street, Unit 7, Warwick, NY 10990 Tel: 1-877-272-0216. Checks or money orders shall be made payable to the Wappingers Central School District. Plan deposit is refundable in accordance with the terms in the Instructions to Bidders to all submitting bids. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs, Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. Each bid shall be prepared and submitted in accordance with the Instructions to Bidders, on the Bid Form bound within the Project Manual. Bidders shall be required to certify on the Bid Form that Bid prices have been arrived at without collusion. Bid Security in the amount of five percent (5%) of the Bid must accompany each bid in accordance with the Instruction to Bidders. One hundred percent (100%) Labor and Material Payment Bond and one hundred percent (100%) Performance Bond will be required of the successful bidder prior to signing the contract. The Owner reserves the right to consider all Bids for a period of forty five (45) days following the bid opening before awarding the Contract, and reserves the right to waive any informalities or to reject any and all Bids. Attention of bidders is particularly called to the requirements as to equal employment opportunity, prevailing wages, and all other Federal, New York State and local requirements. Roy C. Ketcham Senior High John Jay Senior High Van Wyck Junior High Wappingers Junior High Fishkill Elementary Sheafe Road Elementary Vassar Road Elementary Main Garage #1 SED Project No. 13210106-0012-039 SED Project No. 13210106-0020-043 SED Project No. 13210106-0017-027 SED Project No. 13210106-0004-036 SED Project No. 13210106-0005-021 SED Project No. 13210106-0018-022 SED Project No. 13210106-0008-026 SED Project No. 13210106-5007-009

Award

Educational

$1,826,000.00

Public - County

Renovation

135

24

57

7

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Commissioning, General Commissioning Requirements
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Markerboards, Tackboards, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Art, Furnishings and Accessories, Table Accessories, Ceramics, Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Material Storage, Storage Equipment and Systems, Storage Cabinets

Find More Local Projects

Within 75 Miles of This Project
523
Active Projects
338
Bidding Soon
4,872
All Active Projects
2,063
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 26, 2024

img_map_placeholder

Multiple Locations, Wappingers Falls, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 District Wide Renovations - Phase 2-General

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.