BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Myers, Florida. Working plans call for site work for a water / sewer project.

**As of November 25, 2024, all bids received were rejected and project will be rebid. A competitive solicitation for this work will be reissued. SCOPE OF WORK: This Contract is for the restoration of the lake banks of Gateway Lakes 75 and 81 as specified herein. Restoration shall be accomplished by use of an anchor reinforced vegetation system (ARVS), non-woven geotextile, or other repair cross section as shown on the Drawings. The Work consists of furnishing all labor, all equipment, and materials (see below) required for construction, consisting of but not limited to the following: Providing all surveying and field engineering services to establish vertical and horizontal datum and control. Staking residential lot lines, lake maintenance easement locations, and all other services necessary to complete the work as required by the contract documents. All excavation, fill, and compaction required to establish a consistent slope along the lake as shown on the Drawings. Installation of an ARVS and/or non-woven geotextile along the perimeter of the lake as shown on the Drawings. Installation of littorals and trees along the perimeter of the lake as shown on the Drawings. Removing trees, landscaping, and obstruction that are within the lake maintenance easement as shown on the plans. The contractor shall implement measures to mitigate any turbidity in the lakes caused by construction activities. This includes, but is not limited to, the application of a flocculant or other suitable chemical agents to facilitate the aggregation and settling of suspended particles, thereby reducing turbidity levels in the lake post construction. The DISTRICT will require a Bid Security/Bond and a Public Construction Bond on this project. Question Deadline 10/14/2024 at 12:00 PM ET

Final Planning

Water / Sewer

$1,063,300.00

Public - State/Provincial

Site Work

37

13

30

9

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
24
Bidding Soon
442
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2024

May 25, 2025

img_map_placeholder

Multiple Locations, Fort Myers, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.