BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2024 at 7:00 PM

Updated November 27, 2024

Site work for a water / sewer project in Fort Myers, Florida. Completed plans call for site work for a water / sewer project.

**As of November 25, 2024, the award amount is $1,027,481.40. The District reserves the right, in its sole judgment in the best interest of the District, to waive any informalities in any bids; to make award(s) including multiple awards; to waive any non-substantive, in District's sole judgment, irregularity or technicality in bids received, and/or to reject any or all bids. Questions due Monday, October 14, 2024 @ 12:00 PM STRAP#: 18-45-26-L4-4000B.0000 18-45-26-10-00000.00CE 07-45-26-00-00001.1060 SCOPE OF WORK: This Contract is for the restoration of the lake banks of Gateway Lakes 98 and 99 as specified herein. Restoration shall be accomplished by use of an anchor reinforced vegetation system (ARVS), non-woven geotextile, or other repair cross section as shown on the Drawings. The Work consists of furnishing all labor, all equipment, and materials (see below) required for construction, consisting of but not limited to the following: Providing all surveying and field engineering services to establish vertical and horizontal datum and control. Staking residential lot lines, lake maintenance easement locations, and all other services necessary to complete the work as required by the contract documents. All excavation, fill, and compaction required to establish a consistent slope along the lake as shown on the Drawings. Installation of an ARVS and/or non-woven geotextile along the perimeter of the lake as shown on the Drawings. Removing trees, landscaping, and obstruction that are within the lake maintenance easement as shown on the plans. The contractor shall implement measures to mitigate any turbidity in the lakes caused by construction activities. This includes, but is not limited to, the application of a flocculant or other suitable chemical agents to facilitate the aggregation and settling of suspended particles, thereby reducing turbidity levels in the lake post construction. The DISTRICT will require a Bid Security/Bond and a Public Construction Bond on this project.

Award

Water / Sewer

$1,027,481.00

Public - State/Provincial

Site Work

34

12

10

7

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
77
Bidding Soon
979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2024

December 6, 2024

Project location map

Multiple Locations, Fort Myers, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.