EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2024 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Reserve Township, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This work is to repair an approximately 135-foot-long section of retaining wall along the eastern edge of Spring Garden Road south of its intersection with Ramage Road. The work will generally consist of the removal of the existing retaining wall and construction of the new moment slab with toe wall and concrete traffic barrier. The work also involves the removal and replacement of the existing pavement. The County requires pre-qualification of bidders, including subcontractors, as specified in Section 102.01 of Commonwealth of Pennsylvania Department of Transportation Specifications, Publication No.408, 2020 Edition, Change No. 8, Effective April 12, 2024, on this project. Question Deadline 10/01/2024 at 12:00 PM ET Deadline to submit Questions Online. Bid Security - certified check or surety company bond on County's form to the order of/or running to the County of Allegheny in the amount of five (5%) percent of the Bid as evidence that you, the Bidder, will accept and carry out the conditions of the Contract in case of award. Project completion is to occur by August 23, 2025. You may not withdraw your bid for a period of Sixty (60) days after the scheduled closing time for receipt of bids. The County Manager reserves the right to reject any and all bids or waive any informalities in the bidding.

Post-Bid

Roads / Highways

$500,000.00

Public - County

Paving, Site Work

38

4

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Closeout Submittals, Bonds
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Erosion and Sedimentation Controls

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
69
Bidding Soon
1,055
All Active Projects
498
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

November 8, 2024

img_map_placeholder

Ramage Rd & Spring Garden Rd, Reserve Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Spring Garden Road Phase 1A Lateral Support

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.