BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2025 at 8:00 PM

Updated May 9, 2025

Site work and paving for a civil project in Nanton, Alberta. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This Project involves the removal of the existing undersized 900 mm x 20 m CSP and replacement with a bridge sized structure. The structure consists of SPCSP open bottom Culvert 3960 mm span X 2060 mm rise mounted on sheet pile foundation. Mechanically Stabilized Earth (MSE) Walls at both inlet and outlet ends. Work includes geometric improvements to the roadway crossing. The contractor will be responsible for designing and constructing an on-site detour to accommodate traffic during the construction period. The project is located on No Name Creek which is a tributary to the Livingston River on Forestry Trunk Road (500125.8"N 114°2539.5W). The project site is in a remote area with no available services, which may present logistical challenges. Tasks may include: - Water accommodation - Onsite Detour - Excavation (including rock excavation) - Driven sheet piles - SPCSP barrel construction - Soil erosion - Back fill and compaction - Retaining wall construction - Road work (including grade raise) - Rip-Rap installation - Erosion protection measures Question deadline - 24 April 2025

Post-Bid

Bridges / Tunnels

$2,300,700.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
16
Bidding Soon
582
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

August 1, 2025

Project location map

Multiple Locations, Nanton, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.