BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Longview, Washington. Completed plans call for the renovation of a water / sewer project.

. Providing a trailer mounted 250-kW standby power generator and implementing an automated temporary standby power supply system to provide standby power to the pump station in the event of loss of utility power until the new generator and all associated equipment is installed, tested and ready for operation as specified. . Disconnection and removal of an existing 150-kW standby generator unit and associated equipment, conduit and conductors, disconnection and removal of existing intake and exhaust louvers, dampers, and actuators, and saw cutting, removal and disposal of existing reinforced concrete and CMU wall all as shown on the Drawings and as specified. . The Owner retains salvage rights to all existing equipment, conduits and conductors to be removed. The Owner plans to re-utilize the existing generator and is to be removed so it remains in useable condition. If damage occurs during removal that results in the generator not being operable or usable, such damage is to be repaired at no additional cost to the Owner. All existing equipment, conductors and conduits to be turned over to the Owner after removal shall be transported and unloaded at the Owner's treatment facility at 467 Fibre Way, Longview, Washington. . Site prep and furnishing, installing and compacting import aggregate, new reinforced concrete slab, and wall infill (steel stud framing, insulation, and cement board siding) all as shown on the Drawings and as specified. . Furnishing and installing new intake and exhaust louvers, dampers and actuators as shown on the Drawings and as specified. . Installation of an Owner supplied equipment consisting of: 1) a 250 kW standby generator unit consisting of the generator with base mounted fuel tank and remote E-stop station and 2) a dual purpose load bank docking station in a factory provided enclosure in accordance with manufacturer requirements and recommendations, as shown on the Drawings and as specified. The Contractor will be responsible for moving both equipment items from their current locations at the Owner's treatment facility at 467 Fibre Way in Longview to the Kelso Pump Station located adjacent to the Three Rivers Golf Course in Kelso, Washington. . Furnishing and installing, as shown on the Drawings and as specified, electrical conductors and conduit required to connect the generator to the existing ATS and to connect the ATS to the new load bank docking station including all associated interconnections and alarms. . Furnishing and installing miscellaneous equipment, piping, and components, as shown on the Drawings and as specified. . Coordinate with Owner, Engineer and generator and load bank docking station supplier for scheduling and participating in startup, testing and training of Owner staff in the operation of the new generator and docking station as specified. The Three Rivers Regional Wastewater Authority accepts no responsibility or liability and will provide no accommodation to bidders who fail to check for addenda and thereby submit inadequate or incomplete responses. Three Rivers Regional Wastewater Authority will not provide paper copies for the Project bid documents for this project for bidding purposes. A copy of the plans and specifications may be reviewed at the administration office of the Three Rivers Regional Wastewater Plant. All bid proposals must be submitted on the original forms furnished in the Bidding Documents and each must be accompanied by a certified or bank check or bidder's bond made payable to the Three Rivers Regional Wastewater Authority in an amount not less than five percent (5%) of the total bid. No bidder may withdraw their proposal after the hour set for the opening thereof. The Three Rivers Regional Wastewater Authority reserves the right to reject any and/or all bids, to accept the bid deemed in the best interest of the Board, and to waive any informality in the bids. A contract will be awarded or all bids will be rejected within 60 days of the bid opening.

Post-Bid

Water / Sewer

$260,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
27
Bidding Soon
569
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2024

November 7, 2024

img_map_placeholder

To Be Determined, Longview, WA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.