BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Winfield, Alabama. Completed plans call for site work for a water / sewer project.

The work of constructing the Winfield Pilot Travel Center Utilities Infrastructure Project will be let under one Contract. The principal items of work are detailed herein below. Principal Work: 1. Installation of Approximately 1,400 L.F. of 8" Waterline (Install Only) 2. Installation of Approximately 1,000 L.F. of 8" SDR 26 Gravity Sewer Line (Install Only) 3. Service Connections for Water and Sewer (Install Only) 4. Remove Approximately 100 L.F. of Existing 6" Carrier Pipe and Install Approximately 100 L.F. 8" Carrier Pipe Inside a 14" Casing Pipe. The Contractor is Hereby Advised That Time is of the Essence on This Project and That the Contract Time of 35 Consecutive Calendar Days and Noted Restrictions Shall Be Strictly Observed. Liquidated Damages Will Be Assessed if the Contract Time is Exceeded. The Contractor May Apply for an Extension of Time in Accordance With the Provisions of the Contract; However, Such an Extension Must Be Approved Prior to the Contract Completion Date to Avoid the Imposition of Liquidated Damages. There Will Be No Pre-bid Meeting. The successful bidder must furnish a Performance Bond for one hundred (100%) of the bid amount and a Payment Bond for one hundred (100%) percent of the bid amount, and must secure his bond from a bonding company's representative or agent in the State of Alabama. No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving Bids. **commence work the week of October 14th. A Pilot Gas Station is being constructed along I-22 in Winfield. They are pushing to open by December 15 ,2024 *****

Bid Results

Water / Sewer

$365,529.00

Public - City

Site Work

9

15

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
45
Bidding Soon
590
All Active Projects
236
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

October 14, 2024

img_map_placeholder

7016 AL-129, Winfield, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.