BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Laguna Beach, California. Contact the soliciting agency for additional information.

Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Maintenance The contractor shall provide maintenance of approximately 930 streetlights for up to three years with two optional three-year extensions. The contractor shall: Possess a valid California Contractor's C-10 license, maintained in good standing throughout the maintenance contract term; Provide a customer service center for the City and the general public to report problems at any time. This service center must have the ability to log and record all service requests and provide the log with each invoice. The customer service center must also have the ability to immediately dispatch emergency response personnel as determined by City emergency responders; Provide the necessary personnel, abilities and equipment to maintain the streetlights. The maintenance shall include, but not be limited to, quarterly system inspection consisting of documented daytime inspections of the pole, mast arm, fixture, bulb, and other components; and documented night-time inspections for lighting and photocell actuation. The proposal shall include these inspections to occur at monthly intervals. Complete all repairs related to typical maintenance issues (non-emergency) that are reported through the service center, or identified in the routine inspections, within 3 working days of the report; Provide qualified emergency personnel and equipment for 24-hour per day emergency response. The response time shall be less than one hour from the contact with the customer service center to qualified repair personnel and equipment arriving on site. Emergency response will be required for street light knockdowns, obvious equipment damage creating a public danger, or exposed or damaged wiring as determined by City emergency responders; Complete all repairs or replacements needed to restore the street light due to the damage related to the emergency response listed above within 10 days of the emergency report; Complete all repairs using standard traffic control techniques from the California Manual of Traffic Control Devices, WATCH manual, or approved traffic control plans; Maintain an asset management program for the City owned street lights; Be capable of providing the personnel, equipment, and materials for the replacement of approximately 15 streetlights per year. The cost for this service is not to be included in this proposal; Maintain an adequate storage facility and inventory, not on City property, for all necessary parts and equipment needed for the typical maintenance of the streetlights and the emergency response requirements. The facility and inventory shall be within an appropriate distance of the City that will allow for emergency response time of less than one hour; Assist the City in processing claims for damage caused by other parties by providing an itemized list of all relevant information regarding the damages and repair costs to process claims; and Respond to all Underground Service Alert requests and provide appropriate facility marking in accordance to applicable guidelines. All questions related to this RFP shall be in writing and directed to Pierre Sawaya, Senior Project Manager at psawaya@lagunabeachcity.net no later than 5:00 PM, Friday, October 11, 2024.

Sub-Bidding

Roads / Highways

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
113
Bidding Soon
2,436
All Active Projects
1,088
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2024

November 20, 2024

img_map_placeholder

Multiple Locations, Laguna Beach, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.