Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility.
As of December 9, 2024 project was awarded to LS Black Constructors but awarded amount is not available. Deadline for RFP Questions October 10, 2024 at Noon Anticipated Authorization to Proceed November 8, 2024 1.2 Project Description (the "Work") The Project consists of repairs and upgrades to the existing Atrium smoke control system, HVAC system, and fire protection of atrium openings. Smoke control system corrections include fire alarm integration of atrium smoke control systems for; existing exhaust and supply fans, new fire and fire/smoke dampers at existing HVAC ducts and BAS controls of existing air handlers. Fire protection work includes removal of existing fire shutters protecting window openings to Atrium, installation of new fire rated glazing systems, and corrections to finishes. KE Dwan is a fully operating research facility. The successful Respondent will be expected to coordinate schedule of all outages and interruptions of fire alarm, HVAC, and other systems to mitigate disruption to occupants and avoid impact on research. Occupancy of the building and use by the University shall be maintained at all times throughout the Project. Planning of work shall be phased such that required egress paths, building access, and fire ratings of atrium are maintained throughout the Project. Duration of disruption to offices and conference rooms shall be minimized. Respondents should plan outages and temporary protections accordingly. Dunham Engineering is the Architect/Engineer of Record for the Project. 1.3 University-Provided Information The University has assembled the following information about the Project (collectively, the "RFP Documents") for review by the Respondent: o This RFP and all Attachments o RFx Instructions, Requirements, and Rights Reserved by the University o Current Prevailing Wage Rates o Schedule of Values Cost Sheet o Plans and Specifications The University has assembled the following additional RFP Documents (available to view online at the Capital Project Management Website) for review by the Respondent: o The Contract o The General Conditions of the Contract for Construction o The University's Building Standards However, note the RFP Documents are subject to change. The University will provide notice of any changes to the RFP via addenda. Any information provided to Respondents during the RFP process, including the documents enumerated in this Section 1.3, is provided only for your use in preparing your Proposal. Respondents shall independently evaluate the information for their use in preparing the Proposal and shall be solely responsible for their use or interpretation of the information. 1.4 Contract Sum The selected Respondent will perform the Work for a Contract Sum that shall be a fixed, lump sum that shall include all costs necessary to complete the Work in accordance with the Contract Documents, including Respondent's overhead and profit. The total construction budget for this Project is $705,000 (current dollars, no escalation). 1.5 Critical Project Schedule Dates The University requires the Project to be substantially complete by no later than April 25, 2025. Note that Winter Break occurs December 19th through January 20th. Research in the building will continue during this time. Construction Services for corrections to the smoke control system in the KE Dwan facility located on the east bank of the Twin Cities campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. Respondents are prohibited from contacting the identified department about this RFP while in process. Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMENT and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions. Potential Respondents and/or Subcontractors are encouraged to register themselves on the Supplier Matchmaking Google Form. Once registered, the list of interested Respondents / Subcontractors for this RFP can be viewed on the Supplier Matchmaking List. Note: None of the information on the Supplier Matchmaking List has been validated by the University. It is YOUR responsibility to reach out to the suppliers/contacts noted on the list and confirm their information prior to considering a potential partnership. You may also consider reaching out to the Office of Supplier Diversity. Remember to submit your response, including attachments, early to allow time to correct errors. The submission deadline is a hard close. The system will reject responses with errors and will NOT allow late submissions. Contact Information Name Kevin Sullivan Address 1300 S. 2nd Street Minneapolis, MN 55454 Email sull0198@umn.edu Workforce levels of participation 32% Minority Employees; 20% Female Employees; 2% Disabled Employees.
Award
Educational
$705,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2024
November 8, 2024
425 E River Pkwy, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Oct 17 2024
Minneapolis, MN
Bid Date: Oct 08 2024
Minneapolis, MN
Bid Date: Oct 08 2024
Minneapolis, MN
Bid Date: Oct 15 2024
Minneapolis, MN
Bid Date: Oct 24 2024
Minneapolis, MN
Bid Date: Oct 25 2024
Minneapolis, MN
Bid Date: Nov 18 2024
Minneapolis, MN
Bid Date: Oct 23 2024
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Sep 18 2024
Minneapolis, MN
Bid Date: Oct 23 2024
Minneapolis, MN
Bid Date: Oct 23 2024
Minneapolis, MN
Bid Date: Oct 15 2024
Minneapolis, MN
Bid Date: Oct 08 2024
Minneapolis, MN
Bid Date: Sep 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.