BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2026 at 7:00 PM

Updated March 3, 2026

Site work and paving for a transportation facility in Birmingham, Alabama. Conceptual plans call for site work for a transportation facility; and for paving for a transportation facility.

A more detailed scope is expected to be released on a future date. As of March 2, 2026, this project is in the environmental planning phase. A firm has been selected to conduct environmental assessment. A design firm is not expected to be hired until 2026 and construction is estimated to take place in 2027.

Conceptual

Transportation Terminals

$10,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
4
Bidding Soon
624
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

5900 Messer Airport Hwy, Birmingham, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.