BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2024 at 8:00 PM

Updated November 1, 2024

Site work and new construction of a pre-engineered storage facility in Fremont, Nebraska. Completed plans call for the construction of a 28,303-square-foot, one-story above grade pre-engineered storage facility.

The maintenance building will consist of a 28,303 square foot pre-engineered metal building that will be sub-divided into offices, restrooms, locker rooms, parts room, wood shop area, sign shop area, metal fabrication area, and vehicle maintenance bays. The building will utilize interior metal stud framing and interior concrete block walls to sub-divide the spaces. The exterior façade will consist of pre-finished metal wall panels with a masonry veneer wainscot and pre-finished metal roof panels. The vehicle storage building will consist of a 14,400 square foot pre-engineered metal building that will be sub-divided into a wash bay and vehicle storage bays. The building will utilize interior metal stud framing to sub-divide the spaces. The exterior façade will consist of pre-finished metal wall and roof panels. 1) The vehicle storage building is listed as Alternate No. 1, refer to specification Section 01 23 00 Alternates. All required site, framing, finishing, plumbing, mechanical, electrical, paging system, and fire suppression systems shall be included under this contract. Question Deadline Oct 04, 2024 Project Description: 1. The proposed Streets - Parks - Fleet Maintenance Facility will be located at 643 South Luther Road in Fremont NE and will consist of two separate buildings. a. The maintenance building will consist of a 28,303 square foot pre-engineered metal building that will be sub-divided into offices, restrooms, locker rooms, parts room, wood shop area, sign shop area, metal fabrication area, and vehicle maintenance bays. The building will utilize interior metal stud framing and interior concrete block walls to sub-divide the spaces. The exterior facade will consist of pre-finished metal wall panels with a masonry veneer wainscot and pre-finished metal roof panels. b. The vehicle storage building will consist of a 14,400 square foot pre-engineered metal building that will be sub-divided into a wash bay and vehicle storage bays. The building will utilize interior metal stud framing to sub-divide the spaces. The exterior facade will consist of pre-finished metal wall and roof panels. 1) The vehicle storage building is listed as Alternate No. 1, refer to specification Section 01 23 00 - Alternates.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$7,336,000.00

Public - City

New Construction, Site Work

87

23

24

6

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
90
Bidding Soon
965
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

December 16, 2024

Project location map

643 S Luther Rd, Fremont, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.