BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Kirksville, Missouri. Completed plans call for the renovation of a educational facility.

Pershing Hall HVAC Improvements and Magruder Hall Chiller Replacement. DESCRIPTION OF WORK A. This Division requires the furnishing and installing of complete functioning systems, and each element thereof, as specified or indicated on the Drawings and Specifications or reasonably inferred; including every article, device or accessory (whether or not specifically called for by item) reasonably necessary to facilitate each system's functioning as indicated by the design and the equipment specified. Elements of the work include materials, labor, supervision, supplies, equipment, transportation, and utilities. B. Division 22 of the Specifications and Drawings numbered with prefixes P, MP and EP, or MEP generally describe these systems, but the scope of the Plumbing work includes all such work indicated in the Contract Documents: Instructions to Bidders; Proposal Form; General Conditions; Supplementary General Conditions; Architectural, Structural, Mechanical, Plumbing and Electrical Drawings and Specifications; and Addenda. C. The Drawings have been prepared diagrammatically intended to convey the scope of work, indicating the intended general arrangement of the equipment, fixtures, piping, etc. without showing all the exact details as to elevations, offsets, control lines, and other installation requirements. The Contractor shall use the Drawings as a guide when laying out the work and shall verify that materials and equipment will fit into the designated spaces, and which, when installed per manufacturers requirements, will ensure a complete, coordinated, satisfactory and properly operating system. The University reserves the right to reject any or all proposals and to waive any technicalities therein. Document Note: Neither owner nor engineer will be responsible for full or partial sets of bidding documents, including addenda (if any) obtained from sources other than the issuing office. All contract documents must be obtained by the bidder from ADS to be an eligible bidder. All questions by any bidders must be submitted in writing by email to: Dav Bettenhausen Henderson Engineers Dav.Bettenhausen@hendersonengineers.com (Hereinafter referred to as the "Bid Contact Person"). B. In order to be considered, all questions must be received by Dav Bettenhausen at Henderson Engineers by 5:00 pm Central, Friday September 27, 2024.

Post-Bid

Educational

$200,000.00

Public - State/Provincial

Renovation

45

15

13

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
16
Bidding Soon
266
All Active Projects
108
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2024

November 6, 2024

img_map_placeholder

100 E Normal Ave, Kirksville, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.