Published November 7, 2025 at 7:00 PM

Updated November 8, 2025

Renovation of an educational facility in Las Vegas, Nevada. Completed plans call for the renovation of a educational facility.

Renovation of an educational facility in Las Vegas, Nevada. Completed plans call for the renovation of a educational facility. Question Cut Off Date: 10/22/2025 05:00:00 PM (PT) If you have any questions, please contact me at (702) 895-1893 or via email at grace.scheidt@unlv.edu. Alternate Contact; email purchasingunlv@unlv.edu or (702) 895-3521. Detailed Drawings and Specifications: Specifications and/or Drawings for this project are attached as Exhibit C Architectural Drawings and Requirements, Exhibit D Mechanical and Plumbing Drawings and Requirements, Exhibit E UNLV 20 Yr Roofing Warranty and Exhibit F MEP Schedule. Project Completion Date: Completion of this Project must be achieved within forty-five (45) days of notice to proceed. Liquidated Damages in the amount of $1,500.00 per day will be levied for each day the project is not completed after the required Project Completion Date. Liquidated Damages in the amount of $1,0000 for substitution of Key Personnel without prior consent. Scope Remove only the single-ply wall flashing and curb flashing membrane. Leaving the existing field membrane in place. Repair and prepare to receive a new layer of Dens Deck Prime installed directly over the existing EPDM roof membrane and mechanically attaching with the approved PVC manufacturer fasteners and plates conforming to FM 1-75 attachment requirements. Provide and install a new layer of Dens Deck Primed over the existing field membrane. Stagger all joints and mechanically attach with the approved PVC manufacturer fasteners and plates, per the approved PVC manufacturers installation and detail requirements and the following specifications and conforming to FM 1-75 attachment requirements. All restroom exhaust fan curbs must be raised to a height of 10 above the elevation of the existing roofing substrate. All mechanical curbs less than 8 above the finished elevation of the existing roofing substrate must be raised to a height of 10 above the existing roofing substrate. Provide and install a new adhered 80 mil Single Ply Thermoplastic (PVC) Roofing Membrane with factory laminated felt backing along with flashings and other components to comprise a roofing system per the following specifications. Membrane color to be Energy Smart White. Install a new clad metal detail at the perimeter edge where required per the following specifications and detail requirements. Install per PVC manufacturers details and installation requirements. PWP NUMBER: PWP-CL-2026-054

Bid Results

Educational

$289,900.00

Public - State/Provincial

Renovation

25

7

4

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
10
Bidding Soon
418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.