BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Munster, Indiana. Completed plans call for the renovation of a educational facility.

MHS Network Wiring Project Construction Contract: Bids will be received for the following Work: Revise sample subparagraphs below to correspond to the delivery system applicable to Project. Revise below if using construction management or design-build project delivery methods. Munster High School 8808 Columbia Avenue Munster, Indiana 46321 A. Bid security shall be submitted with each bid in the amount of five percent (5%) of the total bid amount, including the Base Bid and all additive Alternate Bids. B. Bid security may be in the form of cashier's check, certified check, money order, or bid bond. C. The Base Bid may be held for a period of thirty (30) days before awarding the Contracts. D. Should a successful bidder withdraw their bid or fail to execute a satisfactory contract within ten (10) days after notice of acceptance of their bid, the Owner may declare the Bid Security forfeited as liquidated damages, not as a penalty A. Successful bidder shall provide a Performance Bond and Payment Bond in the amount equal to one hundred percent (100%) of the total Contract Sum. B. Bonds shall be from a surety company approved to conduct business in the state where the work is being performed. C. Bonds shall remain in full force and effect for a period of one (1) year after the date of final acceptance of the work D . All costs for the Performance Bond and Payment Bond shall be included in the Base Bid price B. Upon award, the Architect will issue a Notice to Proceed on behalf of the Owner. C. Upon receipt of the Notice to Proceed, the successful bidder shall solidify contracts and agreements, file for the necessary approvals and permits, submit the required project documentation to the Architect, and prepare to mobilize on site. D. Fall Semester 2024 The Contractor may work during the evenings to complete any work in unoccupied areas, and nonpublic spaces, which are not used by students or for educational activities, as long as noise and activities do not disrupt educational use of adjacent spaces. For work in public areas, educational spaces, and all areas occupied by students and staff, the Contractor is required to work after hours (3:30pm and later) or on weekends during this timeframe. E. Winter Break 2024: The Contractor will have full access to all areas of the building and at all times desired by the Contractor, as scheduled with the Owner for access. The entire building will be unoccupied, without any use by students, staff, or the public. Portions of the system that require changeover or to be temporarily non-active may be accomplished during this timeframe as well. F. Spring Semester 2025: The Contractor may work during the evenings to complete any work in unoccupied areas, and nonpublic spaces, which are not used by students or for educational activities, as long as noise and activities do not disrupt educational use of adjacent spaces. For work in public areas, educational spaces, and all areas occupied by students and staff, the Contractor is required to work after hours (3:30pm and later) or on weekends during this timeframe. H. Fall Semester, 2025: The Contractor may work during the evenings to complete any work in unoccupied areas, and nonpublic spaces, which are not used by students or for educational activities, as long as noise and activities do not disrupt educational use of adjacent spaces. For work in public areas, educational spaces, and all areas occupied by students and staff, the Contractor is required to work after hours (3:30pm and later) or on weekends during this timeframe. I. Winter Break 2025: The Contractor will have full access to all areas of the building and at all times desired by the Contractor, as scheduled with the Owner for access. The entire building will be unoccupied, without any use by students, staff, or the public. Portions of the system that require changeover or to be temporarily non-active may be accomplished during this timeframe as well. J. Spring Semester 2026 The Contractor may work during the evenings to complete any work in unoccupied areas, and nonpublic spaces, which are not used by students or for educational activities, as long as noise and activities do not disrupt educational use of adjacent spaces. For work in public areas, educational spaces, and all areas occupied by students and staff, the Contractor is required to work after hours (3:30pm and later) or on weekends during this timeframe. K. The Contractor shall achieve Substantial Completion by Monday, June 1, 2026. Substantial Completion for the Project is defined as: 1. Work complete so that spaces are ready to occupy and use for their intended purposes. 2. Fire alarm system and devices fully operable, without faults on the system. Owner reserves the right to reject any and all bids and to waive informalities and irregularities, see the project manual for detailed information. Anticipated Award Date: 11/11/2024 Questions Due by bidders 10/4/2024, 3:00 PM CST

Sub-Bidding

Educational

$500,000.00

Public - City

Renovation

17

7

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
199
Bidding Soon
2,895
All Active Projects
1,329
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 29, 2024

November 25, 2024

img_map_placeholder

8808 Columbia Ave, Munster, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.