BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work and paving for a mixed-use development in Long Beach, California. Working plans call for the demolition of a educational facility; for site work for a educational facility; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of May 18, 2026, the design-build firm has been selected, and all trades are let. Construction is scheduled to start in August 2026 and conclude in August 2028. Project Type RFQual (Request for Qualification) Response Types Response File Type of Award Lump Sum Estimated Bid Value $60,000,000.00 Online Q&A Yes Q&A Deadline 10/11/2024 2:00 PM (PDT) Long Beach Community College District invites Design-Build Entities to submit the Statement of Qualifications and other information required by this RFQ to complete design and construction services of the Long Beach City College, Liberal Arts Campus Student Housing. The District consists of two campuses, the Trades, Technology, and Community Learning Campus located at 1305 East. Pacific Coast Highway, Long Beach, CA 90806 and the Liberal Arts Campus located at 4901 East Carson Street, Long Beach, CA 90808 The Project consists of the design and construction of the following: o 300 beds of Student Housing Complex up to 3-stories. o Provide a mixture of various unit types: o Studio Units o 1-bed Single Units o 2-bed Double Units o Housing Director Unit o Laundry Room Facility o Multi-Purpose Rooms with Kitchen o Independent study rooms o Student lounge spaces o Community gathering spaces o Outdoor gathering spaces o Outdoor Rooftop lounge space The project consists of the complete demolition of an existing asphalt surface parking lot (Parking Lot N & Verizon Parking Lot) approximately 62,583 gross square feet (GSF). The removal of existing light poles, all related site utilities and catch storm basins. Project Site. The project site is of an existing asphalt surface parking lot. October 2026 NTP of Construction Phase January 2028 FFE & Move Management April 2028 Project Substantial Completion August 2028 Project Final Completion

Pre-Construction/Negotiated

Educational

Public - City

Demolition, Paving, Site Work

13

6

6

6

Subscribe For Documents

159 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
684
Active Projects
347
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

August 3, 2026

Project location map

4901 E Carson St, Long Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.