BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2024 at 7:00 PM

Updated November 5, 2025

Site work for a water / sewer project in Long Beach, California. Completed plans call for site work for a water / sewer project.

The Work required by this Contract includes, but is not limited to, the following: demolition of above and below ground structures and facilities; construction and expansion of a new inbound gate. Inbound gate will consist of a new OCR portal building, truck scales, trouble parking area, roadway, high mast light poles, and utilities. Online Q&A Yes Q&A Deadline 11/05/2024 5:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Estimated Bid Value $14,050,000.00 Project Manager: Sunny Zia The Contractor shall achieve Substantial Completion of Work within 385 calendar days and Affidavit of Final Completion of the Project within 445 calendar days as provided in Paragraph SC - 6.1 of the Special Conditions, from a date specified in a written "Notice to Proceed" issued by the City and subject to adjustment as provided in Section 8.2 of the General Conditions. FAILURE OF THE CONTRACTOR TO COMPLETE THE WORK WITHIN THE CONTRACT TIME AND OTHER MILESTONES SET FORTH IN THE SPECIAL CONDITIONS, INCLUDING THE ENGINEER'S APPROVAL OF AFFIDAVIT OF FINAL COMPLETION, WILL RESULT IN ASSESSMENT OF LIQUIDATED DAMAGES IN THE AMOUNTS ESTABLISHED IN THE SPECIAL CONDITIONS. Contractor's License. The Bidder shall hold a current and valid Class "A" California Contractor's License to construct this project. This project is subject to the Port of Long Beach (POLB) Small Business Enterprises (SBE)/Very Small Business Enterprises (VSBE) Program. The combined SBE/VSBE participation goal for this Project is twenty-seven percent (27%) of total bid value. The combined SBE/VSBE participation goal shall include a minimum five percent (5%) of total bid value as VSBE. Prevailing Wage Requirements per Department of Industrial Relations. This Project is a public work Contract as defined in Labor Code Section 1720. The Contractor receiving award of the Contract and Subcontractors of any tier shall pay not less than the prevailing wage rates to all workers employed in execution of the Contract. The Director of Industrial Relations of the State of California has determined the general prevailing rates of wages in the locality in which the Work is to be performed.

Bid Results

Water / Sewer

$12,721,545.00

Public - City

Site Work

2410

30

45

9

Subscribe For Documents

174 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
654
Active Projects
345
Bidding Soon
3,479
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

January 10, 2025

Project location map

725 Harbor Plaza, Long Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.