Site work for a water / sewer project in Greenville, South Carolina. Completed plans call for site work for a water / sewer project.
As per the Owner the project has been cancelled. This project will be rebid on a later date that has not yet been determined. Greenville County has been awarded an ARPA-Funded Stormwater Infrastructure Program (ASIP) grant through the South Carolina Office of Resilience (SCOR) to establish a riparian forest and perform a restoration along the Reedy River watershed. *This bid includes two separate projects at separate locations* The Little Creek Stream Improvement and Riparian Area Reclamation project is intended to establish a riparian forest and perform a restoration along previously acquired floodplain buyout properties within the Reedy River watershed. It is a tributary in the upper Reedy River watershed. Near the confluence of Little Creek with the Reedy River, a group of multiple properties were acquired as part of Greenville County's floodplain buyout program in 2010 to reduce flood risks near the intersection of Plano Drive and Vinson Drive. The proposed project consists of a 6.5-acre reforestation effort, and a one-sided (1,000-ft) and two-sided (400-ft) Priority 2 and 3 stream restoration. The North Chastain Stream Restoration and Riparian Area Reclamation project is intended to establish a riparian forest and perform a restoration along previously acquired floodplain buyout properties within the Reedy River watershed. The proposed project is contained on County-owned property and consists of a 5.5-acre reforestation effort, a 600-ft Priority 2/3 (as categorized by the USACE) stream restoration of an unnamed tributary, and single-sided 600-ft Priority 3/4 stream restoration of Langston Creek. The stream restoration work may include bank grading with the help of soil lifts, coir matting, turf reinforcement matting, boulder walls and bank toe treatments (toe rock, toe wood, and boulder toes(s)). They will also include the installation of instream features such as cross vane(s), boulder/constructed riffle(s), stream drop(s), j-hook vane(s), and single arm vane(s). Additionally, these projects may include re-routing or daylighting of streams. Question Deadline 01/07/2025 at 12:00 PM ET
Award
Water / Sewer
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 21, 2025
February 7, 2025
Multiple Locations, Greenville, SC
Related To This Project
Greenville, SC
Bid Date: Oct 08 2024
Greenville, SC
Bid Date: Oct 15 2024
Greenville, SC
Bid Date: Oct 08 2024
Greenville, SC
Bid Date: Oct 21 2024
Greenville, SC
Bid Date: Nov 05 2024
Greenville, SC
--
Greenville, SC
--
Greenville, SC
Bid Date: Sep 24 2025
Greenville, SC
Bid Date: Oct 23 2024
Greenville, SC
--
Greenville, SC
Bid Date: Oct 16 2024
Greenville, SC
Bid Date: Oct 16 2024
Greenville, SC
Bid Date: Oct 16 2024
Greenville, SC
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.