Site work for a playground / park / athletic field in Riverside, California. Working plans call for site work for a playground / park / athletic field.

**As of November 12, 2024 bids were rejected. No definite date for the rebid.** The Riverside County Superintendent of Schools, herein referred to as SUPERINTENDENT will receive sealed bids for the Migrant Head Start Playground and PIP Installation Project, herein referred to as Project. This Project must be completed within 60 calendar days, herein referred to as Contract Time, as provided in the Bid and Contract Documents, herein referred to as Bid Documents. Prospective Bidders, herein referred to as Contractor, must review the Bid Documents for more complete information regarding this Project and submission of bids. Davis-Bacon Payment of Prevailing Wage Rates: All contractors and subcontractors performing on federal contracts (and contractors or subcontractors performing on federally assisted contracts under the related Acts) in excess of $2,000, shall pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, as determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area (40 USC 276a; 29 CFR Parts 1, 3, 5, 6 and 7.). Apprentices and trainees may be employed at less than predetermined rates. Apprentices must be employed pursuant to an apprenticeship program registered with the Department of Labor Department or with a state apprenticeship agency recognized by the Department. Trainees must be employed pursuant to a training program certified by the Department. Contractors and subcontractors on prime contracts in excess of $100,000 are also required, pursuant to the Contract Work Hours and Safety Standards Act, to pay employees one and one-half times their basic rates of pay for all hours over 40 worked on covered contract work in a workweek. For all projects in excess of $60,000, SUPERINTENDENT S third-party labor compliance contractor will administrate all aspects of SUPERINTENDENT S labor compliance program (LCP). Payment of Prevailing Wage Rates: Pursuant to California Labor Code section 1720 et seq., it shall be mandatory upon CONTRACTOR to and subcontractors are required to pay prevailing wage. Pursuant to the Business and Professions Code 7028.15 and Public Contract Code 3300, Contractor Shall Possess the California Contractor S License(S) Classification B-general Building Contractor or C-61-limited Specialty Classification and D-12-synthetic Products Contractor. Subcontractors Must Possess the Appropriate Licenses for Each Specialty Subcontracted. Each Contractor Shall Be a Licensed Contractor Pursuant to the Business and Professions Code and Shall Be Licensed in the Appropriate Classification for the Work to Be Performed. Failure to Have the Specified License or Licenses Shall Render the Bid Non Responsive and Shall Act as a Bar to the Award of the Contract to Any Contractor Not Possessing the Specified License at the Time of Bid. Licenses Acceptable for the Work Are Intended in the Bid Package Listed Above, and More Than One License May Be Required. The List in No Way Relieves Contractor From Fulfillment of Any Legal Requirement or Licensing Necessary for Performance of Their Work. Question Deadline 10/04/2024 at 2:00 PM PT Questions and/or Requests for Information (RFI) concerning this Project must be made in writing and be sent via email to epurchasing@rcoe.us. The email subject line must state: PreBid RFI for Migrant Head Start Playground and PIP Installation Project. Project Locations and Order: 1. Calexico Center 1120 East 7th Street, Calexico, CA 92231 2. El Centro Center 375 South 1st Street, El Centro, CA 92243 3. Brawley Center 1455 East Magnolia, Brawley, CA 92227 4. Thermal Center 87-220 Church Street, Thermal, CA 92274

Final Planning

Playgrounds / Parks / Athletic Fields

$282,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
104
Bidding Soon
2,260
All Active Projects
1,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

April 7, 2025

img_map_placeholder

To Be Determined, Riverside, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.