Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 10, 2025 at 8:00 PM
Updated April 11, 2025
This is a service / maintenance or supply contract in Falun, Alberta. Contact the soliciting agency for additional information.
If you have questions, please contact the Contact Person below only by email. Contact Person Michael McAllister Water Project Management Engineer Method of Contact michael.mcallister@gov.ab.ca Address 8th Floor Oxbridge Place 9820 - 106 Street Edmonton, Alberta Canada T5K 2J6 Questions must be submitted by email no later than - Sep 30, 2024 at 10:20 am (MT) Description/Summary This project requires a survey of Pigeon Lake Creek. An analysis of the current Creek channel capacity. A comparison of the current capacity to design capacity and recommendations and cost estimates of returning the Creek to design capacity for specified sections. Background Pigeon Lake Creek runs out of Pigeon Lake in central Alberta and is situated about 40 km Northwest of Wetaskawin (Figure 1). The channel was constructed to handle a 1:2 year flood plus a mean monthly lake outflow of 0.7 m3/s (Alberta Environment 1992). Construction of the channel occurred between 1988 and 1990 and some degradation of the channel has occurred since construction. The upper reaches of Pigeon Lake Creek are designed to handle a discharge of 2 m3/s while the maximum design discharge is 4.5 m3/s in the lower reaches. Recent flooding has occurred in the "Low Topography" areas. SCOPE OF WORK Alberta Agriculture and Irrigation requires the services of an Engineering Consultant to undertake an inspection of Pigeon Lake Creek. The services to be provided shall include: 1. Review previous studies, information, drawings, and technical reports. 2. A survey of Pigeon Lake Creek from the Pigeon Lake outlet structure to township road 452 with a higher density of cross sections in identified low topography areas (Figure 2). 3. A comparison of the current channel capacity in each reach (Figure 2) to the design capacity. 4. Provide recommendations and cost estimates for options that would restore original design capacity. 5. Assess bank erosion and provide recommendations and cost estimates for bank restoration and implementation of protective measures. The method of Contractor Selection has not been Determined at this time. Sameng Inc. Current Award $ 119,018.00
Conceptual
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2025
Township Rd 452, Falun, AB
Related To This Project
Calgary, AB
--
Calgary, AB
Bid Date: Sep 27 2024
Wabamun, AB
Bid Date: Nov 01 2024
Edmonton, AB
Bid Date: Oct 08 2024
Calgary, AB
Bid Date: Oct 11 2024
Youngstown, AB
Bid Date: Oct 04 2024
Parkland, AB
Bid Date: Oct 15 2024
Edmonton, AB
Bid Date: Sep 11 2024
Grande Prairie, AB
--
Fort McMurray, AB
Bid Date: Nov 13 2024
Elkwater, AB
Bid Date: Oct 03 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
