Published April 10, 2025 at 8:00 PM

Updated April 11, 2025

This is a service / maintenance or supply contract in Falun, Alberta. Contact the soliciting agency for additional information.

If you have questions, please contact the Contact Person below only by email. Contact Person Michael McAllister Water Project Management Engineer Method of Contact michael.mcallister@gov.ab.ca Address 8th Floor Oxbridge Place 9820 - 106 Street Edmonton, Alberta Canada T5K 2J6 Questions must be submitted by email no later than - Sep 30, 2024 at 10:20 am (MT) Description/Summary This project requires a survey of Pigeon Lake Creek. An analysis of the current Creek channel capacity. A comparison of the current capacity to design capacity and recommendations and cost estimates of returning the Creek to design capacity for specified sections. Background Pigeon Lake Creek runs out of Pigeon Lake in central Alberta and is situated about 40 km Northwest of Wetaskawin (Figure 1). The channel was constructed to handle a 1:2 year flood plus a mean monthly lake outflow of 0.7 m3/s (Alberta Environment 1992). Construction of the channel occurred between 1988 and 1990 and some degradation of the channel has occurred since construction. The upper reaches of Pigeon Lake Creek are designed to handle a discharge of 2 m3/s while the maximum design discharge is 4.5 m3/s in the lower reaches. Recent flooding has occurred in the "Low Topography" areas. SCOPE OF WORK Alberta Agriculture and Irrigation requires the services of an Engineering Consultant to undertake an inspection of Pigeon Lake Creek. The services to be provided shall include: 1. Review previous studies, information, drawings, and technical reports. 2. A survey of Pigeon Lake Creek from the Pigeon Lake outlet structure to township road 452 with a higher density of cross sections in identified low topography areas (Figure 2). 3. A comparison of the current channel capacity in each reach (Figure 2) to the design capacity. 4. Provide recommendations and cost estimates for options that would restore original design capacity. 5. Assess bank erosion and provide recommendations and cost estimates for bank restoration and implementation of protective measures. The method of Contractor Selection has not been Determined at this time. Sameng Inc. Current Award $ 119,018.00

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
1
Bidding Soon
344
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2025

Project location map

Township Rd 452, Falun, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.