BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

This is a service / maintenance or supply contract in Falun, Alberta. Contact the soliciting agency for additional information.

.1 Alberta Parks is seeking a qualified consultant to plan the new future infrastructure of the lower area while evaluating the condition and integrity of the above ground infrastructure and the utility infrastructure located in Peaceful Valley Provincial Recreation Area. .2 The project will be delivered through the following phases, further described in Schedule "A" - Schedule of Services: Phase 1 - Information Gathering and Scope Definition: Gather information and review the current state of the existing Park and its infrastructure. Engage Stakeholders and staff to determine functionality of the site and its operations. Phase 2 - Assessment and Analysis: Identify, assess, analyze and recommend options for infrastructure repair, replacement, upgrade or decommissioning. Consider the financial impact to operations, capital budget planning and decision making. Develop an implementation strategy for the recommended options. Phase 3, Part I - Existing Infrastructure Assessment Reporting Prepare a comprehensive report of findings including recommended options, cost estimates and implementation strategy. Present findings to Alberta Parks. The objectives of the project are to develop cost effective options and recommendations based on detailed condition assessments and operational needs, and to determine a prioritized approach for refurbishment and upgrades of existing infrastructure within the park. Phase 3, Part II - Infrastructure Development and Facility Master Plan Conduct ground and engineering studies of the identified lower portion of Peaceful Valley to determine suitability and site constraints to construct an additional day use lodge, outdoor day use structure, trails and supporting access to the new amenities. Engagement sessions will be required with the Advisory committee during this phase. Develop implementation strategies and Class D estimates for the identified new infrastructure and required supporting infrastructure. The outcomes of this site assessment will guide the further detailed design phases outside the scope of this RFP. Estimated Contract Start Date Mar 5, 2025 Estimated Contract End Date Jul 16, 2025 Estimated Contract Duration 0 Year(s) 19 Week(s) 0 Day(s) *These estimated contract dates and duration are only estimates and subject to change. f you have questions, please contact the Contact Person below only by email. Contact Person Adriane Cairns Senior Capital Infrastructure Planner Method of Contact Adriane.cairns@gov.ab.ca Address Provincial Building 213 - 1 Street W. Cochrane, Alberta Canada T4C 1A5 Questions must be submitted by email no later than - Feb 13, 2025 at 3:00 pm (MT) Question Submission Details Inquiries Contact: Adriane Cairns Email Address: Adriane.cairns@gov.ab.ca The method of Contractor Selection has not been Determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
38
Bidding Soon
588
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

Project location map

To Be Determined, Falun, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.