BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Ladd, Illinois. Completed plans call for the renovation of a educational facility.

2025 Chiller Replacement Work, Ladd School Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to not less than ten percent (10%) of the bid and made payable to Ladd Community Consolidated School District 94. No bid shall be withdrawn for a period of thirty (30) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful bidders will be returned as soon as practical after opening and checking the bids. Successful bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et.seq.). The Owner reserves the right to reject any or all bids and to waive any informalities in bidding. Should a bidder find discrepancies in or omissions from the drawings or documents, or should he be in doubt as to their meaning, he shall at once notify the Architect, at least five (5) days before bids are due, who will send written instructions in the form of an addendum to all bidders A. Work covers complete construction and installation of work specified and/or required, including all trades for the 2025 Chiller Replacement Work, Ladd School located at 232 E. Cleveland Street, Ladd, Illinois for Ladd Community Consolidated School District 94, Ladd, Bureau County, Illinois hereinafter called the Owner and is to be constructed in accordance with the Contract Documents prepared by Healy Bender Patton & Been Architects, 4040 Helene Avenue, Naperville, Illinois, the Architect. B. The intent of work under this contract is for demolition of the existing nonoperational chiller and associated equipment, and for the complete and functional installation of new chiller equipment. C. The Owner has pre-purchased the replacement chiller, Carrier model 30RC1326C, direct from the Sourcewell co-op under separate contract. The Contractor shall coordinate required trades under this contract including but not limited to demolition, mechanical, and electrical work. Work under this contract shall include coordination to accept delivery of the pre-purchased unit to the site. D. Work shall be installed in strict accordance with manufacturer recommendations.

Award

Educational

$114,730.00

Public - City

Renovation

5

11

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
90
Bidding Soon
1,344
All Active Projects
589
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.