EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 16, 2024 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Broken Arrow, Oklahoma. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; road / highway; and road / highway.

Broken Arrow Events Park Infrastructure Improvements - OTA Access Road. Scope The City of Broken Arrow is improving and expanding the infrastructure at Events Park (21101 E 101st St, Broken Arrow, OK 74014). The project includes the construction of a new loop from S 38th Street to the Oklahoma Turnpike, aimed at facilitating better egress for visitors.. The Events Park Infrastructure Improvements construction will take place throughout 2024 and a portion of 2025. The scopes of work for this project include Sitework, Electrical, Concrete, Asphalt, Landscaping, Traffic Control, Street Striping and Street Signage. Bid Result TRAFFIC SIGNAGE & STRIPING - Advanced Workzone Service- 49000 TRAFFIC SIGNAL & ILLUMINATION - Third Generation Electrical, Inc - 175635 ROADWORK - Crossland Heavy Contractors.co - $625,000

Award

Roads / Highways

$849,635.00

Public - City

Paving, Site Work

32

5

116

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Procedures, Closeout Submittals, Warranties
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
49
Bidding Soon
737
All Active Projects
357
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

November 21, 2024

img_map_placeholder

Multiple Locations, Broken Arrow, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Broken Arrow Events Park Infrastructure Improvements - OTA Access Road

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.