BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Chipley, Florida. Conceptual plans call for the demolition of a pre-engineered storage facility; for site work for a pre-engineered storage facility; for the construction of a pre-engineered storage facility; road / highway; and for paving for a road / highway.

District : 03 Selection Method : Letter of Response and Oral Presentation Project Description : Design of FDOT D3 Operations Building Replacement Plain Language Description : The consultant will perform all services required to design a new building to house operations staff at the Florida Department of Transporation Chipley office. Services may include, but are not limited to architectural design, survey, landscape architecture, survey, lighting, roadway design and signing and pavement marking. Number of contracts that may be awarded from this advertisement : 1 Shortlist Selection Date/Time 10/21/2024 07:30 pm Phase II Submittal Deadline Date/Time 11/06/2024 02:30 am Oral Presentation Date/Time 11/07/2024 Final Selection Date/Time 11/18/2024 08:30 pm Negotiations Period Begin Date 12/03/2024 Negotiations Period Ending Date 1/14/2025 The method of contractor selection has not been determined at this time. FL DOT - RFP Design - Design of FDOT D3 Operations Building Replacement

Conceptual

Warehouse / Distribution - Pre-Engineered Storage Building

$2,403,776.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
21
Bidding Soon
320
All Active Projects
131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2025

img_map_placeholder

1074 US-90, Chipley, FL


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.