BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Kirkwood, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Community Center Parking Lot Sealing and Striping Question Deadline 10/02/2024 at 5:00 PM CT A. The City is the City of Kirkwood, 212 South Taylor Avenue, Kirkwood, Missouri and includes its designated representatives. B. The Bidder is the respondent to this solicitation mentioned as such (contractor, seller, vendor, and supplier) in the contract and includes their designated representatives. C. The Specifications includes Instruction to Bidders. The Terms and Conditions of Purchase, the Definitions and the technical specifications of the work. D. A Subcontractor is a person, firm, or corporation supplying labor or materials, or only labor for work at the site of the project for, and under separate contract or agreement with the bidder. E. The term Samples as used, herein includes natural materials, fabricated items, equipment, devices, appliances or parts thereof as called for in the specifications and any other samples as may be required by the City to determine whether the kind, quality, construction, workmanship, finish, color, and other characteristics of the materials, etc., proposed by the bidder conform to the requirements of the contract documents. Samples approved by the City shall establish the kind, quality, and other required characteristics, and all work shall be in accordance with the approved samples. Samples, when requested, shall be supplied at no cost to the City. F. The term Minimum means the City will order this quantity of supplies during the period of the contract at the price bid. G. The term Maximum means the City may order this quantity of supplies during the period of this contract and the bidder should be prepared to supply same at the price bid. H. The term Representatives of the City means the Procurement Director and the member of his staff, or any representative of the City acting within the limits of his authority.

Post-Bid

Sidewalks / Parking Lot

$80,000.00

Public - City

Paving, Site Work

4

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
42
Bidding Soon
840
All Active Projects
429
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2024

November 6, 2024

img_map_placeholder

111 S Geyer Rd, Kirkwood, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.