Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 13, 2024 at 7:00 PM

Updated November 14, 2024

Demolition, site work, paving and new construction of a civil project in Hibbing, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Bridge 92697 Replacement (Zim Road) All in accordance with plans and specifications as prepared by LHB, Inc., 21 West Superior Street, Suite 500, Duluth, MN 55802. Plans and specifications can be seen at the Office of the City Clerk- Treasurer, and at the Office of the City Engineer. Each bid shall be accompanied by a certified check, bidder's bond, or a cash deposit in an amount equal to at least five percent (5%) of the amount of the bid, which shall be forfeited to the City in the event the successful bidder fails to enter into a contract. The City Council reserves the right to retain the deposit of the three lowest bidders for a period not to exceed forty-five (45) days after the date and time set for the opening of bids. No bid may be withdrawn for a period of forty-five (45) days after the date and time set for the opening of the bids. NO BIDS will be received after the specified hour and date. Any such bids received will be returned unopened. The City Council reserves the right to reject any and all bids and to waive irregularities and informalities therein and further reserves the right to award the contract in the best interest of the city. Question Deadline 10/10/2024

Award

Bridges / Tunnels

$562,773.00

Public - City

Demolition, New Construction, Paving, Site Work

23

7

2

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
18
Bidding Soon
234
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 14, 2024

Project location map

Zim Rd, Hibbing, MN

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed