Site work for a civil project in Easton, Pennsylvania. Working plans call for site work for a water / sewer project.

As of November 20, 2024, bid received were rejected and project intends to rebid but no definite date yet. Sealed Bids for the installation of a new HDPE force main crossing and underneath Lehigh River via horizontal directional drilling (HDD) for the Easton Area Joint Sewer Authority Second Street Pumping Station Either a Certified Check or a Bid Bond drawn to the order of the Easton Area Joint Sewer Authority in the amount equal to ten percent (10%) of the amount of the bid must be submitted with the proposal as bid security. A bid bond must have a surety listed on the U.S. Treasury's Circular 570 and authorized to perform services in the Commonwealth of Pennsylvania. The Easton Area Joint Sewer Authority hereby reserves the right, which is understood and agreed to by all bidders, to reject any or all bids, and also reserves the right to waive any omissions, errors, defects, irregularities or informalities in any bid. The successful bidder is required to provide performance, payment and maintenance bonds, and insurance, as provided in the project bid specifications. Question Deadline 10/23/2024 The last day for questions regarding the project or to make a site visit Except as otherwise provided by law, no Bidder may withdraw his bid within sixty (60) consecutive calendar days after the actual date of opening thereof, or one hundred twenty (120) consecutive calendar days if the award is delayed by a required approval of another governmental agency, the sale of bonds or the award of a grant or grants The Pennsylvania Prevailing Wage Act applies to the Project. The successful Bidder shall be required to comply with the Act, and pay wages in accordance with the PA Department of Labor and Industry Prevailing Wage Determination. The Pennsylvania Public Works Employment Verification Act 141 of 2022 also applies to this project.

Final Planning

Water / Sewer

$4,316,200.00

Public - City

Site Work

15

20

4

4

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
494
Active Projects
273
Bidding Soon
4,401
All Active Projects
2,118
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

May 20, 2025

img_map_placeholder

S 2nd St, Easton, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Easton Area Joint Sewer Authority Second Street Pumping Station Force Main Lehigh River Crossing via Horizontal Directional Drill

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.