BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 8, 2026

Site work, paving and renovation of a mixed-use development in Dallas, Texas. Completed plans call for the renovation of a educational facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Scope of Work. The Work consists of: ORG 058 - Alex W. Spence Preparatory Talented and Gifted Academy - Project consists of the following: 1. Marquee sign replacement. 2. Exterior renovation for accessible access to front entry. 3. Interior renovation to vestibule and reception area. 4. Exterior facade cleaning and repair. 5. Historic window refurbishment on exterior of original building. 6. Exterior window glazing replacement at exterior of original building. 7. Partial sidewalk replacement (as indicated). 8. Exterior paving replacement at northeast parking lot, fire lane, and delivery drive. 9. Select infill landscape planting at east facade. 10. Fire alarm system replacement. 11. Exterior light fixture replacement and poles. 12. Electrical panel replacement and relocation. 13. Replace exterior light fixture controls system. 14. Allowance Scope to include: a. Replacement of existing floor finishes (carpet, VCT, etc) in classrooms, corridors, offices, etc. b. Replace and/or encapsulate existing teaching surfaces at classrooms and provide new teaching surfaces. c. Repair / patch / paint previously painted interior wall and ceiling surfaces in classrooms, corridors, offices, etc. d. Demo existing and provide new audio - visual system at auditorium. e. Provide sound system and infrastructure at Gymnasium. f. Renovate existing interior courtyard to correct drainage to sub-surface system, install turf and concrete surfaces, accessible ramp, stairs, etc. g. Provide sod turf at existing soccer field. h. Demo existing and provide new educational casework in classrooms, and offices. Encapsulate existing lockers in corridors. i. Provide pole supported shade structure(s). j. Remove existing and replace light fixtures with LED fixture of similar size and quantity in classrooms, corridors, offices, public spaces, etc. k. Replace / expand access control and security camera system through Digi. Question Deadline 12/05/2025. Technical questions and all other questions related to this solicitation are to be referred to: Attention: Dallas ISD Procurement Services Email: ProcurementCS@dallasisd.org. Total Estimated Construction Budget (CCL + IC+ Allowances) for CSP 207577 $6,282,236.00. The Dallas Independent School District's Construction Services projects have a 30% Small Business Enterprise (SBE) aspirational goal in construction. The right is reserved to reject any or all bids, proposals, CSPs, or statements of qualification and to waive technicalities.

Post-Bid

Educational

$6,282,236.00

Public - City

Paving, Renovation, Site Work

115

32

2

2

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
3
Bidding Soon
2,256
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2026

March 9, 2026

Project location map

4001 Capitol Ave, Dallas, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.