BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a swimming pool in San Ramon, California. Completed plans call for site work for a swimming pool.

Project Information. 2.1 Location and Description. The Project is located at San Ramon Olympic Pool and Aquatic Park, 9900 Broadmoor Drive, San Ramon, CA and is described as follows: 1. All necessary permits, staff, equipment, and materials to complete the below listed activities; 2. Re-plaster the 25-meter lap pool (95 ft X 75 ft); 3. Replace all racing line tiles and target tiles; 4. Replace coping cap tiles with stainless steel under each lane line; 5. Replace inlet tiles with 1" X 1" tiles around 20 inlets to create a 12" X 12" square around each inlet; 6. Replace all LED underwater lights with new in the 25-meter lap pool (16 total); 7. Replace all deck-level safety marker tiles and depth markers per safety requirements; 8. Remove and replace main drain VGB grates. Ensure new grates meet the current VGB code for entrapment; 9. Prepare and resurface gutters and gutter area in the 25-meter pool; 10. Replace the existing 25-meter pool in-wall-steps; 11. Assess and replace lane line anchors as needed in the 25-meter pool; 12. Prepare and skim-coat the surge pit surface in the 25-meter pool; 13. Replace the autofill assembly and the float valve assembly in the 25-meter pool; 14. Replace 4" by 4" inch tiles on stairwell with 2" x 2" inch tiles; 15. Install new ADA-compliant handrails at the steps leading into the pool (4 handrails); 16. Replace hydrostatic valves (2 each); and 17. Measure and certify the 25-meter lap pool in accordance with USA Swimming regulations. Time for Final Completion. The Project must be fully completed within 67 calendar days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about November 25, 2024, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Estimated Cost. The estimated construction cost is $350,000.00. Anticipated Start Date Monday, November 25, 2024 Target Construction Finish Wednesday, January 15, 2025. Target Project Completion Friday, January 31, 2025. Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to Jonette Fuentes, Administrative Analyst at jfuentes@sanramon.ca.gov. Oral responses are not authorized and are not binding on the City. The last day to submit questions is Friday, October 11, 2024 at 2:00 PM. Questions submitted after 2:00 PM on Friday, October 11, 2024, or to any other staff, or by any other method, will not be answered. An interpretation or clarification by City in response to a written inquiry will be issued in an addendum. Each Bid Proposal must be completed, using the form provided in the Contract Documents, signed, and submitted to City in a sealed envelope, with all required forms and attachments, by or before the date and time set forth in Section 1 of the Notice Inviting Bids, or as amended by subsequent addendum. Faxed or emailed Bid Proposals will not be accepted, unless otherwise specified. Late submissions will be returned unopened. City reserves the right to postpone the date or time for receiving or opening bids. Each bidder is solely responsible for all of its costs to prepare and submit its bid and by submitting a bid waives any right to recover those costs from City. The bid price(s) must include all costs to perform the Work as specified, including all labor, material, supplies, and equipment and all other direct or indirect costs such as applicable taxes, insurance and overhead. Bid Security. Each Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's check or certified check, made payable to the City, or bid bond using the form included in the Contract Documents and executed by a surety licensed to do business in the State of California. Performance and Payment Bonds. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents.

GC Bidding

Swimming Pools

$350,000.00

Public - City

Site Work

12

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
183
Bidding Soon
3,459
All Active Projects
1,429
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 21, 2024

November 25, 2024

img_map_placeholder

9900 Broadmoor Dr, San Ramon, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.