BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Chicago, Illinois. Completed plans call for site work for a water / sewer project.

Hirsch HS Feedwater Tank Replacement Provide necessary labor and material to cut out and remove the boiler feed tank and pumps. SUPPLY AND INSTALL, (6) 1 HP feed pumps at 208V (3). Feed tank dimensions 48"x136" tank. Supply and install (3) pump control panels. Provide and remove all the piping connections to the existing pipe. Reconnect all return piping to tank. -Strap and remove the existing pipe from its stand -Cut up the tank and remove it from the building and fabricate the new tank into moveable pieces to get them into the building. -Once delivered they will fit and weld all parts on-site and mount it to the existing stands -Install new piping and valves it inlet of pumps and reconnect pass isolation valve on outlet feed line of pump. -Replace the site glass 34" assembly. Install (2) McDonnell Miller float control. -Insulate the new tank with 2" fiberglass and FSK jacket Provide necessary labor and materials to make any electrical modifications needed for the new unit, including all connections and new piping needed to connect to the building system and boilers. Provide new Pads for new system packages. Provide necessary labor and material to perform factory start up and test operations. Leave the area clean and orderly and remove old equipment from demolition. If building or CPS properties are damaged during construction, replace and/or repair as necessary. Not responsible for contractor errors because of non-field verification. All questions/requests must be received 2 business days, prior to bid closing. All work shall be coordinated with the Board authorized representative to complete in an agreed upon timeframe. Materials and installation must comply with CPS Standards and Specifications as listed on Question Deadline 10/01/2024 All questions/requests must be received 2 business days, prior to bid closing.

Bid Results

Water / Sewer

$98,400.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
93
Bidding Soon
1,772
All Active Projects
749
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.