Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 10, 2025 at 7:00 PM
Updated December 13, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Lake Lotawana, Missouri. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.
(1): Job Jku0110 Route F Jackson County. Bridge Replacement Over Sni-a-bar Creek on Route F, the Total Length of Improvement Being 0.152 Miles. $750K to $1M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. Contract Time: 11/1/26 MO DOT- C05 - Bridge Replacement - Route F *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions concerning the bid document preparation shall be directed to the Central Office - Design Division at (573) 751-2876.
Post-Bid
Bridges / Tunnels
$1,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2025
January 12, 2026
F St, Lake Lotawana, MO
Related To This Project
Lake Lotawana, MO
Bid Date: Apr 09 2024
Lake Lotawana, MO
Bid Date: Mar 15 2021
Gallatin, MO
Bid Date: Nov 19 2025
Kansas City, MO
Bid Date: Dec 09 2025
New Madrid, MO
Bid Date: Nov 13 2025
Kearney, MO
Bid Date: Nov 18 2025
Wright City, MO
Bid Date: Dec 04 2025
Albany, MO
Bid Date: Dec 09 2025
Kansas City, MO
Bid Date: Nov 18 2025
Tuscumbia, MO
Bid Date: Nov 12 2025
Wentzville, MO
Bid Date: Nov 12 2025
Florissant, MO
Bid Date: Nov 10 2025
Kansas City, MO
Bid Date: Nov 21 2025
Pleasant Hill, MO
Bid Date: Nov 25 2025
Springfield, MO
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
