BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of an educational facility in Bowling Green, Ohio. Working plans call for the renovation of a educational facility.

Administration of Project: Local Higher Education Project Name : Founders Hall Renovation - Phase 1 Response Project Location : Founders Residence Hall Project Number : BGU-258873 City / County : Bowling Green State University / Wood Project Manager : Dennis Voss Owner : Bowling Green State University Contracting Authority : Local Higher Education Delivery Method : Design-Build Prevailing Wages : State No. of paper copies requested (stapled, not bound) 0 No. of electronic copies requested (PDF) 1 emailed copy Submit all questions regarding this RFQ in writing to Jacob Konecny at konecnj@bgsu.edu. with the project number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. Project Overview A. Project Description Bowling Green State University requests interested firms submit qualifications for Design-Build (DB) services for Founders Hall Renovation - Phase 1. Founders Hall is located at 707 E. Wooster St. Bowling Green, Ohio. Founders Hall was constructed in 1955 with a major renovation in 1992. It is a primary resident hall housing nearly 600 students and home to BGSU's Honors Program. This request is for the Design and Construction services necessary for Phase 1 of an anticipated 5 Phase Renovation spanning five consecutive summers (each with a construction window of May-July). Each Phase will address a different section of the building moving from east to west. Scope to be evaluated as part of every phase includes, but is not limited to removing and replacing existing plumbing risers with low flow and continuous blockage and renovation of bathrooms; upgrading lighting in common spaces, new carpet, patch and paint and potential mechanical upgrades. Repair and rehabilitation of the perimeter foundation, and stormwater infiltration into various rooms along its perimeter foundation will also be addressed, this includes but not limited to adding/replacing foundation drains, repair/replace header tile and roof drains, survey and make improvements to lower southwest corner, improve grading and irrigation, review entrance canopies and downspout connections and repair irrigation. Additional scope and services may be added as required by BGSU. The Construction Phase 1 can begin on May 5, 2025 and must be substantially complete by August 1, 2025. Founders Hall will be vacant during this period with exception of the Honor's College offices and BGSU's routine maintenance and repair activities, access will need to be maintained for their activities during this work. This request seeks to implement Phase 1 of an anticipated 5 phased renovation within Founders Hall for a total project cost of $3,000,000. Additional scope for related work and/or additional phases of the Founders Hall Renovation may be included at BGSU's discretion. Each additional phase will have a total project cost of $3,000,000 with a total anticipated project cost of $15,000,000 (all five phases).

Final Planning

Educational

$3,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
68
Bidding Soon
936
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

May 5, 2025

img_map_placeholder

707 E Wooster St, Bowling Green, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.